|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/6/2023 Measured TD: 8110 ft. Vertical TD: 8017 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/6/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/5/2010 | | Proposed Top PZ Location: | Sec:34 Twp: 3N 66W | Footage: 2425 FNL 2553 FWL | | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 2425 FNL 2553 FWL | | Proposed Depth/Form: | 8110 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 12 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8101 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 6666 ft., Bottom: 8101 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5088 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 3180 ft., Bottom: 5110 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/24/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8110 ft. | Measured PB depth: | 8068 ft. | | True Vertical TD: | 8017 ft. | True Vertical PB depth: | 7975 ft. | | Top PZ Location: | Sec:34 Twp: 3N 66W | Footage: 2425 FNL 2553 FWL | | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 2425 FNL 2553 FWL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 939 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 939 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8101 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6680 ft., Bottom: 8101 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1206 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 83, Top: 804 ft., Bottom: 1206 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5098 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 3120 ft., Bottom: 5098 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4026 ft. | | N | N | | SUSSEX | 4480 ft. | 4730 ft. | N | N | | NIOBRARA | 7222 ft. | | N | N | | FORT HAYS | 7476 ft. | | N | N | | CODELL | 7505 ft. | | N | N | | J SAND | 7949 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/6/2023 Interval Top: 7952 ft. Interval Bottom: 8012 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/4/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/23/2010 | | Treatment Summary: | FRAC JSND W/161,872 GAL SW & 115,100# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7927 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/25/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1250 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 11727 | | CALC_MCF_GAS | 129 | | CASING_PRESS | 434 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 272 |
| | Perforation Data: | | Interval Top: | 7952 ft. | # Of Holes: | 62 | | Interval Bottom: | 8012 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/3/2010 Interval Top: 7507 ft. Interval Bottom: 7522 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2008 | | Treatment Summary: | 173,735 GALS FLUID & 114,572# 40/70 SAND & 4000# 20/40 R C SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7507 ft. | # Of Holes: | 60 | | Interval Bottom: | 7522 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/6/2023 Interval Top: 7274 ft. Interval Bottom: 7522 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/23/2010 | | Treatment Summary: | NBRR PERF 7274-7359 HOLES 60 SIZE 0.42. CODL PERFF 7507-7522 HOLES 60 SIZE 0.38. NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 5/29/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7927 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/25/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1250 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 11727 | | CALC_MCF_GAS | 129 | | CASING_PRESS | 434 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 272 |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 120 | | Interval Bottom: | 7522 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/3/2010 Interval Top: 7274 ft. Interval Bottom: 7359 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2008 | | Treatment Summary: | 243,753 GALS FLUID & 201,023# 40/70 SAND & 4000 20/40 R C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 60 | | Interval Bottom: | 7359 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/06/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|