|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/8/2021 Measured TD: 6726 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/8/2021 | | Wellbore Permit | | | Permit #: | 20080920 | Expiration Date: | 5/4/2009 | | Proposed Depth/Form: | 6750 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
| Wellbore Completed | | Completion Date: | 9/12/2008 | | Spud Date: | 9/6/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6726 ft. | Measured PB depth: | 6710 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CD,CN,DI.GR,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 373 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 373 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6710 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 5790 ft., Bottom: 6710 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3812 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 2750 ft., Bottom: 3812 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2890 ft. | | N | N | | PARKMAN | 3348 ft. | | N | N | | SUSSEX | 4075 ft. | | N | N | | NIOBRARA | 6298 ft. | | N | N | | FORT HAYS | 6524 ft. | | N | N | | CODELL | 6549 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/22/2021 Interval Top: 6550 ft. Interval Bottom: 6560 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/20/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6550 ft. | # Of Holes: | 20 | | Interval Bottom: | 6560 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/8/2021 Interval Top: 6302 ft. Interval Bottom: 6560 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/10/2008 | | Treatment Summary: | FRAC CD W/TOTAL OF 48426 GALS OF PAD FLUID. PUMP 83580 GALS OF DYNAFLOW-2WR W/245140 LBS OF 20/40 SAND. FINAL ISDP= 3029 PSI, 5 MIN= 2933. AVE PRESS= 3213 PSI, AVE RATE= 14.4 BPM. SET FRAC PLUG. FRAC NB WITH TOTAL OF 39316 GALS OF PAD FLD. SEE OPTR CMTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 90 | | BBLS_OIL | 48 | | BTU_GAS | 1233 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 479 | | CALC_MCF_GAS | 23 | | CASING_PRESS | 800 | | GRAVITY_OIL | 43 | | MCF_GAS | 23 |
| | Perforation Data: | | Interval Top: | 6302 ft. | # Of Holes: | 72 | | Interval Bottom: | 6560 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/22/2021 Interval Top: 6302 ft. Interval Bottom: 6448 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6302 ft. | # Of Holes: | 52 | | Interval Bottom: | 6448 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/08/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|