|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/10/2024 Measured TD: 6993 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/10/2024 | | Wellbore Permit | | | Permit #: | 20081673 | Expiration Date: | 4/28/2009 | | Proposed Depth/Form: | 7000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S2NW4 |
| | |
| Wellbore Completed | | Completion Date: | 5/8/2008 | | Spud Date: | 5/4/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6993 ft. | Measured PB depth: | 6965 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP.DENS.NEUTRON GR; DUAL IND. GR; CMNT BOND-VD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 494 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 494 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6979 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 3120 ft., Bottom: 6979 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2700 ft. | | N | N | | PARKMAN | 3538 ft. | | N | N | | SUSSEX | 4305 ft. | | N | N | | SHANNON | 4905 ft. | | N | N | | NIOBRARA | 6589 ft. | | N | N | | FORT HAYS | 6836 ft. | | N | N | | CODELL | 6875 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/12/2008 Interval Top: 6877 ft. Interval Bottom: 6889 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/28/2008 | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/20/2008 | | Treatment Summary: | FRAC CODELL W/4111 BBLS SLICKWATER & 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT @ AN AVERAGE OF 4784# 55 BPM. MAX PRESSURE 5127# MAX RATE 60.8 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/12/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 50 | | BTU_GAS | 1242 | | CALC_GOR | 1680 | | CASING_PRESS | 275 | | GRAVITY_OIL | 46 | | MCF_GAS | 84 |
| | Perforation Data: | | Interval Top: | 6877 ft. | # Of Holes: | 48 | | Interval Bottom: | 6889 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/2/2008 Interval Top: 6704 ft. Interval Bottom: 6730 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/8/2008 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2008 | | Treatment Summary: | FRAC NIOBRARA WITH 4128 BBLS DYNAFLOW 2WR FLUID, AND 238000 30/50 SAND, AND 12000 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% HCL ACID AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4770 59.5BPM. MAX. PRESSURE 5185, MAX RATE 60.7BPM. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 43 | | BBLS_OIL | 90 | | BTU_GAS | 1242 | | CALC_GOR | 2044 | | CASING_PRESS | 250 | | GRAVITY_OIL | 47 | | MCF_GAS | 184 |
| | Perforation Data: | | Interval Top: | 6704 ft. | # Of Holes: | 104 | | Interval Bottom: | 6730 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/10/2024 Interval Top: 889 ft. Interval Bottom: 6704 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/8/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6758 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/4/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 31 | | BTU_GAS | 1242 | | CALC_GOR | 1806 | | CASING_PRESS | 1100 | | GRAVITY_OIL | 47 | | MCF_GAS | 56 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 889 ft. | # Of Holes: | 152 | | Interval Bottom: | 6704 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/10/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/15/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|