|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/26/2024 Measured TD: 8390 ft. Vertical TD: 7871 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/28/2013 | | Proposed Top PZ Location: | Sec:6 Twp: 5N 67W | Footage: 671 FNL 678 FWL | | Bottom Hole Location: | Sec:6 Twp: 5N 67W | Footage: 671 FNL 678 FWL | | Proposed Depth/Form: | 8390 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 814 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 860, Top: 2584 ft., Bottom: 8317 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/11/2008 | | Spud Date: | 7/2/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8390 ft. | Measured PB depth: | 8343 ft. | | True Vertical TD: | 7871 ft. | True Vertical PB depth: | 7824 ft. | | Top PZ Location: | Sec:6 Twp: 5N 67W | Footage: 671 FNL 678 FWL | | Bottom Hole Location: | Sec:6 Twp: 5N 67W | Footage: 671 FNL 678 FWL | | Log Types: | CBL, PNN PROCESSED LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 814 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 860, Top: 2584 ft., Bottom: 8371 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7444 ft. | | N | N | | FORT HAYS | 7742 ft. | | N | N | | CODELL | 7759 ft. | | N | N | | J SAND | 8223 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/4/2011 Interval Top: 7760 ft. Interval Bottom: 7775 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/10/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/8/2008 | | Treatment Summary: | 170,000 GALS FLUID & 110,000# 40/70 SAND & 4000# 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7760 ft. | # Of Holes: | 60 | | Interval Bottom: | 7775 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/26/2024 Interval Top: 7450 ft. Interval Bottom: 7775 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/10/2008 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/11/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/22/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1325 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 1500 | | CALC_MCF_GAS | 3 | | CASING_PRESS | 270 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7450 ft. | # Of Holes: | 180 | | Interval Bottom: | 7775 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/4/2011 Interval Top: 7450 ft. Interval Bottom: 7660 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/10/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/8/2008 | | Treatment Summary: | 100,000 GALS CLAY FIX & 226,000 GALS FLUID & 369,000# 20/40 SAND & 8000# 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7450 ft. | # Of Holes: | 120 | | Interval Bottom: | 7660 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|