Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25774
Well Classification: OW Status: PA - 10/16/2019
Well Name/No:DACONO STATE #10-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:72/2841S
Facility Status:PAStatus Date10/16/2019
FacilityID:295647LocationID:332928
Municipality/County:FREDERICK / WELD #123Location:NWSE 36 2N68W 6
Field:WATTENBERG - #90750Elevation:5016 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2065FSL  1950 FELLat/Long: 40.093330 / -104.949250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.093339 / -104.949242Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/13/2013
End Date: 9/13/2013
Reported: 10/31/2013
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/16/2019             Measured TD: 7862 ft.    Vertical TD: 7854 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/16/2019
Wellbore PermitDIRECTIONAL
Permit #:20081259 Expiration Date:4/20/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2130 FSL  2130 FEL
Bottom Hole Location:Sec:36 Twp: 2N 68W Footage: 2130 FSL  2130 FEL
Proposed Depth/Form:7880 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE

Wellbore Completed
Completion Date:9/3/2008
Spud Date:8/28/2008Spud Date Is:ACTUAL
Measured TD:7862 ft.Measured PB depth:7812 ft.
True Vertical TD:7854 ft.True Vertical PB depth:7804 ft.
Top PZ Location:Sec:36 Twp: 2N 68WFootage: 2154 FSL  2124 FEL
Bottom Hole Location:Sec:36 Twp: 2N 68WFootage: 2154 FSL  2124 FEL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7843 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 949, Top: 850 ft., Bottom: 7843 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4100 ft.NN
SUSSEX4544 ft.NN
SHANNON5070 ft.NN
NIOBRARA7382 ft.NN
FORT HAYS7664 ft.NN
CODELL7686 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2013                Interval Top: 7686 ft.    Interval Bottom: 7706 ft.

 Completed Information for Formation CODELL
1st Production Date:12/24/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2013Treatment End Date:9/13/2013
Treatment Summary:CODELL REFRAC 4851 BBL SLICKWATER, 4851 BBL TOTAL FLUID. 150400# 40/70 SAND, 4000# 20/40 SAND, 154400# TOTAL SAND.
Total fluid used in treatment (bbls):4851Max pressure during treatment (psi):4512
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):364
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):154400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/9/2008
Treatment Summary:170,491 GLAS FLUDID & 115, 520 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7686 ft.# Of Holes:60
Interval Bottom:7706 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/16/2019                Interval Top: 7466 ft.    Interval Bottom: 7706 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/24/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/3/2008
Treatment Summary:COMMINGLE NIOBRARA AND CODELL
Tubing Size:2.375 in.Tubing Setting Depth:7661 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
BTU_GAS 1237
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 15000
CALC_MCF_GAS 15
CASING_PRESS 1248
GRAVITY_OIL 51
MCF_GAS 15
TUBING_PRESS 1242
Perforation Data:
Interval Top:7466 ft.# Of Holes:150
Interval Bottom:7706 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/16/2009                 Interval Top: 7466 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/24/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/10/2008
Treatment Summary:1000 GALS ACID & 246,306> GALS FLUID & 200,920 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7466 ft.# Of Holes:90
Interval Bottom:7564 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/16/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No