|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/20/2023 Measured TD: 7761 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/20/2023 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 7/20/2012 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NE/4 | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: UNSPACED , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 988 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 397, Top: 0 ft., Bottom: 988 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7751 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 930, Top: 1220 ft., Bottom: 7751 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/4/2008 | | Spud Date: | 9/30/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7761 ft. | Measured PB depth: | 7748 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 988 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 397, Top: 0 ft., Bottom: 988 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7751 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 930, Top: 1230 ft., Bottom: 7751 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3998 ft. | | N | N | | SUSSEX | 4523 ft. | | N | N | | SHANNON | 5130 ft. | | N | N | | TEEPEE BUTTES | 6195 ft. | | N | N | | NIOBRARA | 6810 ft. | | N | N | | FORT HAYS | 7126 ft. | | N | N | | CODELL | 7150 ft. | | N | N | | GREENHORN | 7228 ft. | | N | N | | D SAND | 7551 ft. | | N | N | | MOWRY | 7596 ft. | | N | N | | J SAND | 7612 ft. | | N | N | | J-3 SAND | 7644 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/20/2023 Interval Top: 7616 ft. Interval Bottom: 7649 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/23/2009 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/28/2011 | | Treatment Summary: | D Sand & J Sand are covered by temporary bridge plug for Codell/Niobrara recomplete
| | Formation Treatment | | Treatment Date: | 1/12/2009 | | Treatment Summary: | FRAC'D JSND WITH 175350 GALS SLICK WATER AND SILVERSTIM, PURGEL III AND 330000#'S OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7616 ft. | # Of Holes: | 44 | | Interval Bottom: | 7649 ft. | Hole Size: | 0.41 in. |
|
Formation DJSND Formation Classification: GW Status: CM - 4/3/2009 Interval Top: 7553 ft. Interval Bottom: 7649 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | D & J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2008 | | Treatment Summary: | COMMINGLE DSND & JSND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7591 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 4 | | BTU_GAS | 1150 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 43250 | | CALC_MCF_GAS | 173 | | CASING_PRESS | 625 | | GRAVITY_OIL | 60 | | MCF_GAS | 173 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7553 ft. | # Of Holes: | 48 | | Interval Bottom: | 7649 ft. | Hole Size: | |
|
Formation DSND Formation Classification: GW Status: AB - 4/20/2023 Interval Top: 7553 ft. Interval Bottom: 7555 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 3/23/2009 | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/28/2011 | | Treatment Summary: | D Sand & J Sand are covered by temporary bridge plug for Codell/Niobrara recomplete | | Formation Treatment | | Treatment Date: | 1/12/2009 | | Treatment Summary: | FRACKED DSND WITH 10458 GALS PHASER FRAC AND 4 PERCENT KCL WITH 11819 LBS OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSND. |
| | Perforation Data: | | Interval Top: | 7553 ft. | # Of Holes: | 8 | | Interval Bottom: | 7555 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/20/2023 Interval Top: 6918 ft. Interval Bottom: 7164 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/17/2011 | | Treatment Summary: | Codell/Niobrara recomplete; Codell & Niobrara are commingled
D Sand & J Sand are covered by temporary bridge plug for Codell/Niobrara recomplete
The Codell is producing through a composite flow through plug
Codell 7152'-7164', 48 holes
Frac'd Codell w/116399 gals Silverstim, Acid, and Slick Water with 246060 lbs Ottawa sand
Niobrara 6918'-7012', 48 holes
Frac'd Niobrara w/156349 gals Silverstim and Slick Water with 250740 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 5 | | BTU_GAS | 1181 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 5800 | | CALC_MCF_GAS | 29 | | CASING_PRESS | 400 | | GRAVITY_OIL | 46 | | MCF_GAS | 29 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 6918 ft. | # Of Holes: | 96 | | Interval Bottom: | 7164 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/20/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|