|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/3/2019 Measured TD: 8276 ft. Vertical TD: 8261 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/3/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20080670 | Expiration Date: | 3/30/2009 | | Proposed Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 2114 FNL 797 FEL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 2114 FNL 797 FEL | | Proposed Depth/Form: | 8204 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 11/1/2008 | | Spud Date: | 10/26/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8276 ft. | Measured PB depth: | 8202 ft. | | True Vertical TD: | 8261 ft. | True Vertical PB depth: | 8187 ft. | | Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 2114 FNL 797 FEL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 2114 FNL 797 FEL | | Log Types: | CBL, DUAL IND/COMPENSATD DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 774 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 774 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8262 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6630 ft., Bottom: 8262 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5152 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 3870 ft., Bottom: 5174 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4406 ft. | | N | N | | SHANNON | 4960 ft. | | N | N | | NIOBRARA | 7322 ft. | | N | N | | CODELL | 7618 ft. | | N | N | | J SAND | 8046 ft. | | N | N | | DAKOTA | 8222 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/3/2019 Interval Top: 8058 ft. Interval Bottom: 8078 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/12/2008 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND W/ 149,688 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,222# SAND. 11/12/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8058 ft. | # Of Holes: | 32 | | Interval Bottom: | 8078 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/21/2008 Interval Top: 7396 ft. Interval Bottom: 8078 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2008 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE. DRILLED OUT CFP @ 7510'. 11/12/08. DRILLED OUT CFP @ 7740' TO COMMINGLE THE JSND-NBRR-CODL. 12/8/08. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8028 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/21/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 115 | | BBLS_OIL | 55 | | BTU_GAS | 1180 | | CALC_BBLS_H2O | 115 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 9545 | | CALC_MCF_GAS | 525 | | CASING_PRESS | 1314 | | GRAVITY_OIL | 49 | | MCF_GAS | 525 | | TUBING_PRESS | 690 |
| | Perforation Data: | | Interval Top: | 7396 ft. | # Of Holes: | 140 | | Interval Bottom: | 8078 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/3/2019 Interval Top: 7396 ft. Interval Bottom: 7638 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/12/2008 | | Treatment Summary: | NB-CD RECOMPLTN. SET CFP @7740'. FRAC'D CODL W/109,368 GAL 24# VISTAR HYBRID CROSS LINKED GEL W/250,160# SAND. SET CFP@ 7510'. FRAC'D NBRR W/131,040 GAL 18# VISTAR HYBRID CROSS LINKED GEL W/ 250,660# SAND. 11/12/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/16/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 149 | | BBLS_OIL | 100 | | BTU_GAS | 1180 | | CALC_BBLS_H2O | 149 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 2670 | | CALC_MCF_GAS | 267 | | CASING_PRESS | 973 | | GRAVITY_OIL | 49 | | MCF_GAS | 267 |
| | Perforation Data: | | Interval Top: | 7396 ft. | # Of Holes: | 108 | | Interval Bottom: | 7638 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/03/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|