|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/25/2019 Measured TD: 7950 ft. Vertical TD: 7838 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/25/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076792 | Expiration Date: | 3/27/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2580 FNL 1320 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 2580 FNL 1320 FEL | | Proposed Depth/Form: | 7941 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/19/2008 | | Spud Date: | 4/15/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7950 ft. | Measured PB depth: | 7902 ft. | | True Vertical TD: | 7838 ft. | True Vertical PB depth: | 7790 ft. | | Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 2590 FNL 1327 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 2590 FNL 1327 FEL | | Log Types: | CBL, DIL/GL/GR, CNL/CDL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7935 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 2670 ft., Bottom: 7935 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3675 ft. | | N | N | | SUSSEX | 4126 ft. | 4325 ft. | N | N | | SHANNON | 4665 ft. | 4708 ft. | N | N | | NIOBRARA | 7102 ft. | | N | N | | FORT HAYS | 7358 ft. | | N | N | | CODELL | 7377 ft. | | N | N | | J SAND | 7812 ft. | 7860 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/24/2011 Interval Top: 7378 ft. Interval Bottom: 7398 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/15/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/20/2011 | | Treatment Summary: | CIBP SET @ 7320' ON 1/20/2011. REMOVED ON 3/7/2011. COMMINGLED WITH NB. | | Formation Treatment | | Treatment Date: | 5/13/2008 | | Treatment Summary: | 204254 GALS FLUID & 154556 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1319 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 106 | | CALC_GOR | 1048 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 60 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/25/2019 Interval Top: 7150 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/7/2011 | | Treatment Summary: | NB-RECOMPLETE.
CD- CIBP REMOVED |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7361 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 18 | | BTU_GAS | 1270 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 6111 | | CALC_MCF_GAS | 110 | | CASING_PRESS | 1024 | | GRAVITY_OIL | 52 | | MCF_GAS | 110 | | TUBING_PRESS | 790 |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 126 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/6/2011 Interval Top: 7150 ft. Interval Bottom: 7266 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/24/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2011 | | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 228,302 gal Slickwater w/ 201,200# 40/70, 4,000# SB Excel.
RETURNED DOWNLINE WITH CD AFTER CIBP WAS REMOVED ON 3/10/2011. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 66 | | Interval Bottom: | 7266 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/25/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|