|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2022 Measured TD: 8070 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/30/2010 | | Proposed Depth/Form: | 8070 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1037 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 12 ft., Bottom: 1037 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8070 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 695, Top: 3817 ft., Bottom: 8070 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/25/2008 | | Spud Date: | 4/21/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8070 ft. | Measured PB depth: | 8022 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CDL/CNL/ML, DIL/GL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1037 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 1037 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8057 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 2780 ft., Bottom: 8057 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4117 ft. | | N | N | | SUSSEX | 4510 ft. | | N | N | | NIOBRARA | 7215 ft. | | N | N | | FORT HAYS | 7448 ft. | | N | N | | CODELL | 7479 ft. | | N | N | | J SAND | 7930 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 3/1/2022 Interval Top: 7966 ft. Interval Bottom: 7986 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/5/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2011 | | Treatment Summary: | SET RETREIVABLE BRIDGE PLUGS @ 7220-7228, 7270-7278, AND 7370-7375. | | Formation Treatment | | Treatment Date: | 3/29/2010 | | Treatment Summary: | FRAC JSND W/ 159,390 GAL SW & 115,120# 40/70 SAND & 4,000# 20/40 SUPERLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1318 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 64000 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 782 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 165 |
| | Perforation Data: | | Interval Top: | 7966 ft. | # Of Holes: | 60 | | Interval Bottom: | 7986 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/8/2012 Interval Top: 7481 ft. Interval Bottom: 7496 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/4/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 5/12/2008 | | Treatment Summary: | 159000 GALS FLUID & 117340 LBS 30/50 SAND & 4000 LBS 20/40 SB SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7481 ft. | # Of Holes: | 60 | | Interval Bottom: | 7496 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 3/1/2022 Interval Top: 7236 ft. Interval Bottom: 7496 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/4/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2011 | | Treatment Summary: | SET RETREIVABLE BRIDGE PLUGS @ 7220-7228, 7270-7278, AND 7370-7375. | | Formation Treatment | | Treatment Date: | 4/1/2010 | | Treatment Summary: | NBRR PERF 7236-7325 HOLES 60 SIZE 0.42. CODL PERF 7481-7496 HOLES 60 SIZE 0.38. NO ADDITIONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1318 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 64000 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 782 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 165 |
| | Perforation Data: | | Interval Top: | 7236 ft. | # Of Holes: | 120 | | Interval Bottom: | 7496 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/8/2012 Interval Top: 7236 ft. Interval Bottom: 7325 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/4/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/12/2008 | | Treatment Summary: | 235997 GALS FLUID AND 200320 LLBS 30/50 SAND & 4000 LBS 20/40 SB SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7236 ft. | # Of Holes: | 60 | | Interval Bottom: | 7325 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|