|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2023 Measured TD: 7955 ft. Vertical TD: 7863 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/17/2010 | | Proposed Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 2590 FNL 1320 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 2563 FNL 1320 FWL | | Proposed Depth/Form: | 7921 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 538 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 538 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7938 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 7938 ft., Bottom: 6430 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4790 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 170, Top: 4790 ft., Bottom: 3960 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/9/2008 | | Spud Date: | 12/3/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7955 ft. | Measured PB depth: | 7920 ft. | | True Vertical TD: | 7863 ft. | True Vertical PB depth: | 7828 ft. | | Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 2590 FNL 1320 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 2563 FNL 1320 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 538 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 538 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7938 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6430 ft., Bottom: 7938 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4790 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 3960 ft., Bottom: 4790 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4426 ft. | | N | N | | SHANNON | 5107 ft. | | N | N | | NIOBRARA | 6982 ft. | | N | N | | CODELL | 7288 ft. | | N | N | | J SAND | 7762 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 6/1/2023 Interval Top: 7775 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/26/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2008 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND W/ 148,302 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,320# SAND. 12/22/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7762 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/20/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 3 | | BTU_GAS | 1157 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 198333 | | CALC_MCF_GAS | 595 | | CASING_PRESS | 745 | | GRAVITY_OIL | 60 | | MCF_GAS | 595 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7775 ft. | # Of Holes: | 48 | | Interval Bottom: | 7820 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/12/2009 Interval Top: 7080 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2008 | | Treatment Summary: | JSND-NCRR-CDL COMMINGLE. SET CBP @ 7000'. 12-8-09. DRILLED OUT CBP @ 7000', 7200', AND 7400' TO COMMINGLE THE JSND-NBRR-CDL. 12/09/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7801 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 20 | | BTU_GAS | 1196 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 24800 | | CALC_MCF_GAS | 496 | | CASING_PRESS | 674 | | GRAVITY_OIL | 62 | | MCF_GAS | 496 | | TUBING_PRESS | 424 |
| | Perforation Data: | | Interval Top: | 7080 ft. | # Of Holes: | 148 | | Interval Bottom: | 7820 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 6/1/2023 Interval Top: 7080 ft. Interval Bottom: 7288 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/12/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/2/2009 | | Treatment Summary: | NBRR-CDL RECOMPLETION, SET CBP @ 7400'. 10/27/09. FRAC'D THE CODELL WITH 250,380 20/40 SAND IN 78,036 GALS VISTAR 24 SLF. STAGED 1# TO 5#. TOTAL GELLED FLUID - 92,820 GALS. TOTAL FRAC FLUID - 117,096. 11/02/09 SET CBP @ 7200. FRAC'D THE NIOBRARA WITH |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7080 ft. | # Of Holes: | 100 | | Interval Bottom: | 7288 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 131 |
| Total Gas Produced (MCF) | 9340 |
| GOR | 71297 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.758 |
| Average MCFE per Day | 27.598 |
| Federal Financial Assurance | i | |
|
|