Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25578
Well Classification: GW Status: PA - 4/15/2025
Well Name/No:ANDERSON #33-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/15/2025
FacilityID:294898LocationID:309912
County:WELD #123Location:NWSE 34 7N66W 6
Field:EATON - #19350Elevation:4910 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1920FSL  2041 FELLat/Long: 40.529390 / -104.762530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.529360 / -104.762560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 4/15/2025             Measured TD: 7520 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 4/15/2025
Wellbore Permit
Permit #:20080098 Expiration Date:3/9/2009
Proposed Depth/Form:7975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 460, Top: 0 ft., Bottom: 6475 ft.

Wellbore Completed
Completion Date:3/29/2008
Spud Date:3/24/2008Spud Date Is:ACTUAL
Measured TD:7520 ft.Measured PB depth:7480 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 895 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 895 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7505 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 880, Top: 85 ft., Bottom: 7505 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7074 ft.NN
FORT HAYS7356 ft.NN
CODELL7376 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/1/2008                  Interval Top: 7380 ft.    Interval Bottom: 7390 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2008
Treatment Summary:FRAC'D CODELL USING 643 BBLS OF SILVERSTIM 22# PAD, 1974 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 218060LBS OF 30/50 WH SND AND 8000LBS OF SB EXCEL 12/20 RESIN COATED PROPPANT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7380 ft.# Of Holes:30
Interval Bottom:7390 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/15/2025                 Interval Top: 7081 ft.    Interval Bottom: 7390 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/30/2008Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/29/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7365 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 40
BTU_GAS 1249
CALC_BBLS_H2O 3
CALC_BBLS_OIL 40
CALC_GOR 1575
CALC_MCF_GAS 63
CASING_PRESS 1700
GRAVITY_OIL 46
MCF_GAS 63
TUBING_PRESS 900
Perforation Data:
Interval Top:7081 ft.# Of Holes:72
Interval Bottom:7390 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/1/2008                  Interval Top: 7081 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2008
Treatment Summary:NBRR A 7081-7083 (6 HOLES), NBRR B 7208-7220 (36 HOLES); FRAC'D NBRR WITH 1000 GALS OF 15% HCL, 600 BBLS OF SLICKWATER PAD, 600 BBLS OF SILVERSTIM 22# PAD, 2259 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 235660LBS OF 30/50 WH SND AND 12000LBS OF SB EXCEL 12/20
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7081 ft.# Of Holes:42
Interval Bottom:7220 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/15/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No