|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/11/2008 Measured TD: 7505 ft. Vertical TD: 7459 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/11/2008 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076778 | Expiration Date: | 3/5/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2050 FNL 2050 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 2050 FNL 2050 FEL | | Proposed Depth/Form: | 7496 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: 3N68W | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7496 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7496 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/11/2008 | | Spud Date: | 6/5/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7505 ft. | Measured PB depth: | 4719 ft. | | True Vertical TD: | 7459 ft. | True Vertical PB depth: | | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 2050 FNL 2050 FEL | | Log Types: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 922 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 7507 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 3258 ft., Bottom: 7507 ft., Determination Method: CBL | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: AB - 6/11/2008 Measured TD: 7515 ft. Vertical TD: 7468 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW AB - 6/11/2008 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083977 | Expiration Date: | 6/12/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1955 FNL 1827 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 1955 FNL 1827 FEL | | Proposed Depth/Form: | 7444 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NE |
| | |
| Wellbore Completed | | Completion Date: | 6/19/2008 | | Spud Date: | 6/5/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7515 ft. | Measured PB depth: | 7472 ft. | | True Vertical TD: | 7468 ft. | True Vertical PB depth: | 7425 ft. | | Top PZ Location: | Sec:34 Twp: 3N 68W | Footage: 1894 FNL 1833 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 1894 FNL 1833 FEL | | Log Types: | CBL,P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 921 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 7507 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 2945 ft., Bottom: 7507 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7108 ft. | | N | N | | CODELL | 7341 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 6/11/2008 Interval Top: 7341 ft. Interval Bottom: 7361 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/14/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/25/2013 | Treatment End Date: | 9/25/2013 | | Treatment Summary: | CODELL REFRAC
4606 BBL SLICKWATER, 4606 BBL TOTAL FLUID.
151580# 40/70 SAND, 4000# 20/40 SAND, 155580# TOTAL SAND. | | Total fluid used in treatment (bbls): | 4606 | Max pressure during treatment (psi): | 5528 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 155580 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 7/18/2008 | | Treatment Summary: | 167,279 GALS FLUID & 115,840 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7341 ft. | # Of Holes: | 80 | | Interval Bottom: | 7361 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/11/2008 Interval Top: 7108 ft. Interval Bottom: 7361 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/19/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7320 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/24/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 859 | | GRAVITY_OIL | 53 | | MCF_GAS | 30 | | TUBING_PRESS | 521 |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 166 | | Interval Bottom: | 7361 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/11/2008 Interval Top: 7108 ft. Interval Bottom: 7231 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/18/2008 | | Treatment Summary: | 245,721 GALS FLUID & 200,020 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 86 | | Interval Bottom: | 7231 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/11/2008 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|