|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/13/2018 Measured TD: 7968 ft. Vertical TD: 7839 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/13/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/30/2012 | | Proposed Top PZ Location: | Sec:34 Twp: 3N 68W | Footage: 2586 FNL 1300 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 2583 FNL 1317 FEL | | Proposed Depth/Form: | 7968 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 902 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 902 ft. | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 7955 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 3450 ft., Bottom: 7955 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2008 | | Spud Date: | 5/29/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7968 ft. | Measured PB depth: | 7928 ft. | | True Vertical TD: | 7839 ft. | True Vertical PB depth: | 7799 ft. | | Top PZ Location: | Sec:34 Twp: 3N 68W | Footage: 2586 FNL 1300 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 2586 FNL 1300 FEL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 901 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 7955 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 3532 ft., Bottom: 7955 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3708 ft. | 3920 ft. | N | N | | SUSSEX | 4206 ft. | 4380 ft. | N | N | | SHANNON | 4740 ft. | 4770 ft. | N | N | | TEEPEE BUTTES | 5926 ft. | 5929 ft. | N | N | | NIOBRARA | 7189 ft. | | N | N | | FORT HAYS | 7406 ft. | | N | N | | CODELL | 7429 ft. | | N | N | | J SAND | 7857 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 8/13/2018 Interval Top: 7868 ft. Interval Bottom: 7884 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/11/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 151,641 gal Slickwater w/ 115,440# 40/70, 4,460# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7868 ft. | # Of Holes: | 48 | | Interval Bottom: | 7884 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/3/2011 Interval Top: 7430 ft. Interval Bottom: 7450 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/14/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/4/2008 | | Treatment Summary: | 168,169 GALS FLUID & 117,000 LBS 30/50 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 60 | | Interval Bottom: | 7450 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/7/2011 Interval Top: 7218 ft. Interval Bottom: 7884 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/11/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2011 | | Treatment Summary: | NB PERF 7218-7305 HOLES 60 SIZE .42
CD PERF 7430-7450 HOELS 60 SIZE .38
JSND PERF 7868-7884 HOLES 48 SIZE .42 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7833 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/7/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 18 | | BTU_GAS | 1271 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 26888 | | CALC_MCF_GAS | 484 | | CASING_PRESS | 881 | | GRAVITY_OIL | 54 | | MCF_GAS | 484 | | TUBING_PRESS | 825 |
| | Perforation Data: | | Interval Top: | 7218 ft. | # Of Holes: | 168 | | Interval Bottom: | 7884 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/13/2018 Interval Top: 7218 ft. Interval Bottom: 7450 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/14/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/5/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/9/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1317 | | CALC_BBLS_OIL | 130 | | CALC_GOR | 3500 | | CALC_MCF_GAS | 455 | | CASING_PRESS | 1850 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7218 ft. | # Of Holes: | 120 | | Interval Bottom: | 7450 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/3/2011 Interval Top: 7218 ft. Interval Bottom: 7305 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/4/2008 | | Treatment Summary: | 1000 GALS ACID & 209,990 GALS FLUID & 325,000 LBS 30/50 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7218 ft. | # Of Holes: | 60 | | Interval Bottom: | 7305 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/13/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|