Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25567
Well Classification: OW Status: PR - 11/1/2025
Well Name/No:GUSTAFSON #31-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2025
FacilityID:294850LocationID:309907
County:WELD #123Location:NENW 31 7N65W 6
Field:EATON - #19350Elevation:4827 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:657FNL  2109 FWLLat/Long: 40.537200 / -104.708260Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.537190 / -104.708250Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2025             Measured TD: 7464 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2025
Wellbore Permit
Permit #:20091059 Expiration Date:3/31/2010
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NW4

Wellbore Completed
Completion Date:2/12/2010
Spud Date:2/7/2010Spud Date Is:ACTUAL
Measured TD:7464 ft.Measured PB depth:7422 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CIMO. DENSITY NEUTRON GR; DUAL IND LOG GR; CEMENT BOND VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 550 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7438 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 3036 ft., Bottom: 7438 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2910 ft.NN
PARKMAN3790 ft.NN
SUSSEX4505 ft.NN
NIOBRARA6991 ft.NN
FORT HAYS7243 ft.NN
CODELL7259 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/30/2010                 Interval Top: 7262 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation CODELL
1st Production Date:3/9/2010Choke Size:0.219 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/22/2010
Treatment Summary:FRAC CODELL WITH 4121 BBLS SLICKWATER AND 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 5666 PSI 60.7BPM. MAX PRESSURE 6479PSI. MAX RATE 62.8BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 60
BTU_GAS 1242
CALC_GOR 1667
CASING_PRESS 200
GRAVITY_OIL 47
MCF_GAS 100
Perforation Data:
Interval Top:7262 ft.# Of Holes:56
Interval Bottom:7276 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 11/1/2025                 Interval Top: 7000 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/17/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7251 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 35
BTU_GAS 1242
CALC_GOR 1429
CASING_PRESS 1100
GRAVITY_OIL 50
MCF_GAS 50
TUBING_PRESS 850
Perforation Data:
Interval Top:7000 ft.# Of Holes:188
Interval Bottom:7276 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/11/2010                Interval Top: 7000 ft.    Interval Bottom: 7202 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/22/2010Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:FRAC NIOBRARA WITH 4156 BBLS DYNAFLOW 2 WR FLUID; 238,000# 30/50 SAND; AND 12,000# 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE-PAD. TREAT AT AN AVERAGE OF 5416PSI 63.4 BPM MAX PRESSURE 6183 PSI MAX RATE 64.2 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 44
BTU_GAS 1242
CALC_GOR 455
CASING_PRESS 200
GRAVITY_OIL 43
MCF_GAS 20
Perforation Data:
Interval Top:7000 ft.# Of Holes:132
Interval Bottom:7202 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)141
Total Gas Produced (MCF)137
GOR971
GOR DeterminationBOE
Average BOE per Day0.447
Average MCFE per Day2.600

 Federal Financial Assurance  i Y

 Tribal Well  i No