Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25565
Well Classification: OW Status: PR - 11/1/2025
Well Name/No:GUSTAFSON #31-52
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2025
FacilityID:294848LocationID:309905
County:WELD #123Location:NENW 31 7N65W 6
Field:EATON - #19350Elevation:4825 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1313FNL  1517 FWLLat/Long: 40.535450 / -104.710390Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.535470 / -104.710340Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2025             Measured TD: 7454 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2025
Wellbore Permit
Permit #: Expiration Date:8/17/2012
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 520 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 520 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7450 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 6350 ft., Bottom: 7450 ft.

Wellbore Completed
Completion Date:3/10/2011
Spud Date:3/6/2011Spud Date Is:ACTUAL
Measured TD:7454 ft.Measured PB depth:7431 ft.
True Vertical TD:True Vertical PB depth:
Log Types:High Resolution Induction; Compensated Density Compensate Neutron Gamma Ray; Gamma Ray CCL Cement Bond VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 549 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 549 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7445 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 3128 ft., Bottom: 7445 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2910 ft.
PARKMAN3796 ft.
SUSSEX4518 ft.
NIOBRARA6964 ft.
FORT HAYS7235 ft.
CODELL7271 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 11/1/2025                 Interval Top: 7272 ft.    Interval Bottom: 7288 ft.

 Completed Information for Formation CODELL
1st Production Date:3/31/2011Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/23/2011
Treatment Summary:Frac the Codell with 3955 bbls Slickwater and 115,100# 30/50 sand. Spearhead 500 bbls 7% KCL ahead of frac. Treat at an average of 5124 psi at 58.3 bpm. Max. pressure 6000 psi. Max. rate 59.7 bpm.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2011Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 58
BTU_GAS 1242
CALC_GOR 1034
CASING_PRESS 275
GRAVITY_OIL 51
MCF_GAS 60
Perforation Data:
Interval Top:7272 ft.# Of Holes:64
Interval Bottom:7288 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)103
Total Gas Produced (MCF)50
GOR485
GOR DeterminationBOE
Average BOE per Day0.305
Average MCFE per Day1.760

 Federal Financial Assurance  i Y

 Tribal Well  i No