Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25563
Well Classification: GW Status: PA - 4/12/2021
Well Name/No:SCHMUNK #31-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/12/2021
FacilityID:294846LocationID:309903
County:WELD #123Location:NWNE 31 7N65W 6
Field:EATON - #19350Elevation:4853 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:524FNL  1821 FELLat/Long: 40.537460 / -104.703250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.537470 / -104.703280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/12/2021             Measured TD: 7484 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/12/2021
Wellbore Permit
Permit #:20080106 Expiration Date:3/5/2009
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2NE4

Wellbore Completed
Completion Date:10/2/2008
Spud Date:9/26/2008Spud Date Is:ACTUAL
Measured TD:7484 ft.Measured PB depth:7450 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CD/CN/GR, DIL/GR, CBL
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 585 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 585 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7472 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 3462 ft., Bottom: 7472 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2924 ft.NN
PARKMAN3830 ft.NN
SUSSEX4456 ft.NN
NIOBRARA7022 ft.NN
FORT HAYS7318 ft.NN
CODELL7352 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/11/2008                Interval Top: 7353 ft.    Interval Bottom: 7369 ft.

 Completed Information for Formation CODELL
1st Production Date:11/7/2008Choke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/22/2008
Treatment Summary:FRAC CODL WITH 4120 BBLS SLICKWATER AND 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 5533# 59 BPM. MAX PRESSURE 6090#, MAX RATE 60.7 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/11/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 60
BTU_GAS 1242
CALC_GOR 1200
CASING_PRESS 400
GRAVITY_OIL 47
MCF_GAS 72
Perforation Data:
Interval Top:7353 ft.# Of Holes:64
Interval Bottom:7369 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/12/2021                 Interval Top: 7152 ft.    Interval Bottom: 7369 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/5/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 7
BTU_GAS 1242
CALC_GOR 714
CASING_PRESS 1225
GRAVITY_OIL 44
MCF_GAS 5
TUBING_PRESS 250
Perforation Data:
Interval Top:7152 ft.# Of Holes:176
Interval Bottom:7369 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 9/29/2010                 Interval Top: 7152 ft.    Interval Bottom: 7180 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/27/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/25/2010
Treatment Summary:FRAC NIBRARA WITH 4431 BLS NYNAFLOW 2 WR FLID; 238000# 30/50 SAND; AND 12000# RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE-PAD. TREAT AT AN AVERAGE OF 5009 PSI 62.2 BPM MAX PRESSURE 5757 PSI MAX RATE 64.5 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/29/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 20
BTU_GAS 1242
CALC_GOR 1250
CASING_PRESS 450
GRAVITY_OIL 44
MCF_GAS 25
Perforation Data:
Interval Top:7152 ft.# Of Holes:112
Interval Bottom:7180 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/12/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No