|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/9/2023 Measured TD: 7458 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/9/2023 | | Wellbore Permit | | | Permit #: | 20091056 | Expiration Date: | 3/31/2010 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 2/21/2010 | | Spud Date: | 2/18/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7458 ft. | Measured PB depth: | 7400 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY NEUTRON GAMMA RAY; RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 601 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 601 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7422 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 2163 ft., Bottom: 7422 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2972 ft. | | N | N | | PARKMAN | 3829 ft. | | N | N | | SUSSEX | 4550 ft. | | N | N | | NIOBRARA | 7050 ft. | | N | N | | FORT HAYS | 7242 ft. | | N | N | | CODELL | 7280 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/20/2010 Interval Top: 7280 ft. Interval Bottom: 7296 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/4/2010 | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/2/2010 | | Treatment Summary: | FRAC CODELL WITH 4122 BBLS SLICKWATER AND 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4736 PSI 65.6 BPM. MAX PRESSURE 5044 PSI MAX RAGE 65.9 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 28 | | BTU_GAS | 1242 | | CALC_GOR | 1250 | | CASING_PRESS | 200 | | GRAVITY_OIL | 47 | | MCF_GAS | 35 |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 64 | | Interval Bottom: | 7296 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/9/2023 Interval Top: 7066 ft. Interval Bottom: 7296 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/5/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7266 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 12 | | BTU_GAS | 1242 | | CALC_GOR | 2083 | | CASING_PRESS | 1250 | | GRAVITY_OIL | 44 | | MCF_GAS | 25 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7066 ft. | # Of Holes: | 272 | | Interval Bottom: | 7296 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/28/2010 Interval Top: 7066 ft. Interval Bottom: 7118 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/25/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | 9/22/10: FRAC NIOBRARA WITH 2240 BBLS DYNAFLOW 2 WR FLUID; SPEARHEAD 24BBLS 15% ACID AHEAD OF FRAC & 500 BBLS 7% KCL IN PRE-PAD. eQUIPMENT FAILURES FORCED JOB TO CUT SHORT AT GEL PAD STAGE. NO SAND PUMPED. 9/23/10: RAC NIO W/ 4029 BBLS DYNAFLOW 2 WR FLUID; 23800# 30/50 SAND; 12000# 20/40 RESIN COATED SAND. tREAT AT AVG. 5303PSI @ 59.8BPM MAX PRESSURE:6280PSI MAX RATE:71.5PBM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/28/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 35 | | BTU_GAS | 1242 | | CALC_GOR | 800 | | CASING_PRESS | 500 | | GRAVITY_OIL | 44 | | MCF_GAS | 28 |
| | Perforation Data: | | Interval Top: | 7066 ft. | # Of Holes: | 208 | | Interval Bottom: | 7118 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/09/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|