|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/25/2023 Measured TD: 7478 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/25/2023 | | Wellbore Permit | | | Permit #: | 20080113 | Expiration Date: | 3/5/2009 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 10/27/2008 | | Spud Date: | 10/22/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7478 ft. | Measured PB depth: | 7448 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND- VD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7465 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 3292 ft., Bottom: 7465 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2915 ft. | | N | N | | PARKMAN | 3808 ft. | | N | N | | SUSSEX | 4400 ft. | | N | N | | NIOBRARA | 6955 ft. | | N | N | | FORT HAYS | 7219 ft. | | N | N | | CODELL | 7256 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 12/5/2008 Interval Top: 7258 ft. Interval Bottom: 7276 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/13/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2008 | | Treatment Summary: | FRAC CODELL WITH 4005 BBLS SLICKWATER, AND 115000 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4781 PSI 50.1 BPM. MAX. PRESSURE 5378 PSI MAX. RATE 51.8BPM |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7243 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/5/2008 | Test Method: | PLUNGER LIFT | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 58 | | BTU_GAS | 1242 | | CALC_GOR | 948 | | CASING_PRESS | 1100 | | GRAVITY_OIL | 47 | | MCF_GAS | 55 | | TUBING_PRESS | 950 |
| | Perforation Data: | | Interval Top: | 7258 ft. | # Of Holes: | 64 | | Interval Bottom: | 7276 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/24/2010 Interval Top: 6956 ft. Interval Bottom: 7098 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/15/2010 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/14/2010 | | Treatment Summary: | FRAC NIO W/ 4156 BBLS DYNAFLOW2 WR; 238000 30/50 SAND AND 17000 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE=PAD. TREAT AT AN AVG 5170 PSI 54.3 BPM. MAX PRESSURE 6123, MAX RATE 61.7 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/24/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 31 | | BTU_GAS | 1242 | | CALC_GOR | 1548 | | CASING_PRESS | 225 | | GRAVITY_OIL | 47 | | MCF_GAS | 48 |
| | Perforation Data: | | Interval Top: | 6956 ft. | # Of Holes: | 136 | | Interval Bottom: | 7098 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/25/2023| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/18/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2010 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7249 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/8/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 27 | | BTU_GAS | 1242 | | CALC_GOR | 1222 | | CASING_PRESS | 900 | | GRAVITY_OIL | 47 | | MCF_GAS | 33 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/25/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|