Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25560
Well Classification: OW Status: PA - 7/25/2023
Well Name/No:SCHMUNK #31-42
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/25/2023
FacilityID:294843LocationID:309900
County:WELD #123Location:SENE 31 7N65W 6
Field:EATON - #19350Elevation:4843 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1886FNL  617 FELLat/Long: 40.533630 / -104.698960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.533610 / -104.698940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/25/2023             Measured TD: 7478 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/25/2023
Wellbore Permit
Permit #:20080113 Expiration Date:3/5/2009
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE4

Wellbore Completed
Completion Date:10/27/2008
Spud Date:10/22/2008Spud Date Is:ACTUAL
Measured TD:7478 ft.Measured PB depth:7448 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND- VD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7465 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3292 ft., Bottom: 7465 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2915 ft.NN
PARKMAN3808 ft.NN
SUSSEX4400 ft.NN
NIOBRARA6955 ft.NN
FORT HAYS7219 ft.NN
CODELL7256 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/5/2008                 Interval Top: 7258 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation CODELL
1st Production Date:11/13/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2008
Treatment Summary:FRAC CODELL WITH 4005 BBLS SLICKWATER, AND 115000 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4781 PSI 50.1 BPM. MAX. PRESSURE 5378 PSI MAX. RATE 51.8BPM
Tubing Size:2.375 in.Tubing Setting Depth:7243 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/5/2008Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 58
BTU_GAS 1242
CALC_GOR 948
CASING_PRESS 1100
GRAVITY_OIL 47
MCF_GAS 55
TUBING_PRESS 950
Perforation Data:
Interval Top:7258 ft.# Of Holes:64
Interval Bottom:7276 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/24/2010                 Interval Top: 6956 ft.    Interval Bottom: 7098 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/15/2010Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2010
Treatment Summary:FRAC NIO W/ 4156 BBLS DYNAFLOW2 WR; 238000 30/50 SAND AND 17000 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE=PAD. TREAT AT AN AVG 5170 PSI 54.3 BPM. MAX PRESSURE 6123, MAX RATE 61.7 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/24/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 31
BTU_GAS 1242
CALC_GOR 1548
CASING_PRESS 225
GRAVITY_OIL 47
MCF_GAS 48
Perforation Data:
Interval Top:6956 ft.# Of Holes:136
Interval Bottom:7098 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/25/2023

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/18/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/18/2010
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7249 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/8/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 27
BTU_GAS 1242
CALC_GOR 1222
CASING_PRESS 900
GRAVITY_OIL 47
MCF_GAS 33
TUBING_PRESS 650
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/25/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No