|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/15/2025 Measured TD: 7520 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/15/2025 | | Wellbore Permit | | | Permit #: | 20080097 | Expiration Date: | 2/28/2009 | | Proposed Depth/Form: | 7975 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: W2SE4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2SE4 | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 6475 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/4/2008 | | Spud Date: | 3/30/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7520 ft. | Measured PB depth: | 7459 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7475 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 6550 ft., Bottom: 7475 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6550 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 300 ft., Bottom: 6550 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7070 ft. | | N | N | | FORT HAYS | 7355 ft. | | N | N | | CODELL | 7375 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/1/2008 Interval Top: 7378 ft. Interval Bottom: 7386 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/1/2008 | | Treatment Summary: | FRAC'D CODELL USING 646 BBLS OF VISTAR 20# FLUID SYSTEM, 220900 LBS OF 20/40 WHITE SAND AND 8360 LBS OF EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 24 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/15/2025 Interval Top: 7079 ft. Interval Bottom: 7386 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/12/2008 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7366 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/1/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 44 | | BTU_GAS | 1249 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 1568 | | CALC_MCF_GAS | 69 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 46 | | MCF_GAS | 69 | | TUBING_PRESS | 1050 |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 60 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.34 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/1/2008 Interval Top: 7079 ft. Interval Bottom: 7212 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/1/2008 | | Treatment Summary: | NIOBRARA A 7079-7081 (6 HOLES), NIOBRARA B 7202-7212 (30 HOLES); FRAC'D NIOBRARA WITH 1000 GALS OF 15% HCL, 800 BBLS OF SLICKWATER PAD, 491 BBLS OF VISTAR 18# PAD, 2437 BBLS OF VISTAR 18# FLUID SYSTEM, 241500 LBS OF 30/50 WH SND AND 13200LBS OF SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 36 | | Interval Bottom: | 7212 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/15/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 04/26/2023 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|