|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/2/2025 Measured TD: 7495 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/2/2025 | | Wellbore Permit | | | Permit #: | 20088106 | Expiration Date: | 12/23/2009 | | Proposed Depth/Form: | 7975 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 6475 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/24/2008 | | Spud Date: | 3/19/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7495 ft. | Measured PB depth: | 7456 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 882 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 882 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7481 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 975, Top: 0 ft., Bottom: 7481 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7032 ft. | | N | N | | FORT HAYS | 7316 ft. | | N | N | | CODELL | 7337 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 5/18/2017 Interval Top: 7340 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/13/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/2/2008 | | Treatment Summary: | FRAC'D CODELL USING 643 BBLS OF VISTAR 20# PAD, 1911 BBLS OF VISTAR 20# FLUID SYSTEM, 220280 LBS OF 20/40 WHITE SAND AND 8100 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 49 | | BTU_GAS | 1266 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 49 | | CALC_GOR | 1020 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 1900 | | GRAVITY_OIL | 45 | | MCF_GAS | 50 | | TUBING_PRESS | 1400 |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 30 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/2/2025 Interval Top: 7035 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/13/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7035 ft. | # Of Holes: | 66 | | Interval Bottom: | 7350 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 5/23/2017 Interval Top: 7035 ft. Interval Bottom: 7174 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/13/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/23/2017 | Treatment End Date: | N/A | | Treatment Summary: | During the orginal completion, the Niobrara formation was perforated from 7035'- 7037' and 7164'- 7174' (3 spf). Duel fire 3 1/8" slickgun and EXT charges, 22.7 gram charge, 35.1" penetration, 120 degree phasing. The completion of this formation was never reported as they were unable to frac the formation, however, the perforations are still open. Please see attached operations summary for details. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7035 ft. | # Of Holes: | 36 | | Interval Bottom: | 7174 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/02/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 03/25/2025 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|