|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/16/2019 Measured TD: 8030 ft. Vertical TD: 7847 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/16/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/14/2012 | | Proposed Top PZ Location: | Sec:34 Twp: 3N 68W | Footage: 646 FNL 674 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 639 FNL 678 | | Proposed Depth/Form: | 8030 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 of Sec 34 3N68W | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: 3N68W | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 907 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 907 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8023 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: 2650 ft., Bottom: 8023 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/6/2008 | | Spud Date: | 5/1/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8030 ft. | Measured PB depth: | 7995 ft. | | True Vertical TD: | 7847 ft. | True Vertical PB depth: | 7812 ft. | | Top PZ Location: | Sec:34 Twp: 3N 68W | Footage: 646 FNL 674 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 68W | Footage: 646 FNL 674 FEL | | Log Types: | CBL, PNN (BRIDGED OUT AT 5205) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8023 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 2200 ft., Bottom: 8023 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3775 ft. | | N | N | | SUSSEX | 4175 ft. | | N | N | | SHANNON | 4750 ft. | | N | N | | NIOBRARA | 7148 ft. | | N | N | | FORT HAYS | 7430 ft. | | N | N | | CODELL | 7446 ft. | | N | N | | J SAND | 7880 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/16/2019 Interval Top: 7883 ft. Interval Bottom: 7905 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/20/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/2/2010 | | Treatment Summary: | JSND Perf: 7883-7905 Holes: 66 Size: .38
Frac JSND w/ 168,804 gal Slickwater w/ 115,540# 40/70 sand, 4,000# SB Excel sand
Commingled with NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7883 ft. | # Of Holes: | 66 | | Interval Bottom: | 7905 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 1/20/2011 Interval Top: 7448 ft. Interval Bottom: 7468 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/25/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/9/2008 | | Treatment Summary: | 168.329 GALS FLUID & 115,260 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 80 | | Interval Bottom: | 7468 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/17/2011 Interval Top: 7202 ft. Interval Bottom: 7905 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/20/2010 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/7/2010 | | Treatment Summary: | JSND Perf: 7883-7905 Holes: 66 Size: .38
Frac JSND w/ 168,804 gal Slickwater w/ 115,540# 40/70 sand, 4,000# SB Excel sand
CD Perf: 7448-7468 Holes: 80 Size: .38; no new treatment
NB Perf: 7202-7334 Holes: 64 Size: .42; no new treatment
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7859 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/17/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 6 | | BTU_GAS | 1302 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 3666 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 919 | | GRAVITY_OIL | 50 | | MCF_GAS | 22 | | TUBING_PRESS | 707 |
| | Perforation Data: | | Interval Top: | 7202 ft. | # Of Holes: | 210 | | Interval Bottom: | 7905 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/16/2019 Interval Top: 7202 ft. Interval Bottom: 7468 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/25/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/7/2010 | | Treatment Summary: | No new formation treatment; drilled out plug to commingle with Niobrara and JSND on 12/7/10. CD perfs 7448-7468, 80 holes @.38 '. NB perfs 7202-7334, 64 holes @.42". No new treatment; drilled out plug to commingle NB and JSND on 12/7/10 | | Formation Treatment | | Treatment Date: | 5/6/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1282 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 81 | | CALC_GOR | 1470 | | CALC_MCF_GAS | 119 | | CASING_PRESS | 200 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7202 ft. | # Of Holes: | 144 | | Interval Bottom: | 7468 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/20/2011 Interval Top: 7202 ft. Interval Bottom: 7334 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/25/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/9/2008 | | Treatment Summary: | 1000 GALS ACID & 247,553 GALS FLUID & 200,180 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7202 ft. | # Of Holes: | 64 | | Interval Bottom: | 7334 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/16/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|