|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 7456 ft. Vertical TD: 7378 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20077120 | Expiration Date: | 2/26/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1200 FNL 75 FEL | | Bottom Hole Location: | Sec:32 Twp: 3N 65W | Footage: 1200 FNL 75 FEL | | Proposed Depth/Form: | 7475 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 402-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 3/8/2008 | | Spud Date: | 3/5/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7456 ft. | Measured PB depth: | 7414 ft. | | True Vertical TD: | 7378 ft. | True Vertical PB depth: | 7336 ft. | | Top PZ Location: | Sec:32 Twp: 3N 65W | Footage: 1187 FNL 67 FEL | | Bottom Hole Location: | Sec:32 Twp: 3N 65W | Footage: 1187 FNL 67 FEL | | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 789 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 789 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7429 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 1108 ft., Bottom: 7429 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2973 ft. | | N | N | | PARKMAN | 4019 ft. | | N | N | | SUSSEX | 4535 ft. | | N | N | | SHANNON | 5111 ft. | | N | N | | TEEPEE BUTTES | 6158 ft. | | N | N | | NIOBRARA | 6994 ft. | | N | N | | FORT HAYS | 7272 ft. | | N | N | | CODELL | 7296 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 5/16/2008 Interval Top: 7300 ft. Interval Bottom: 7314 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/2008 | | Treatment Summary: | FRAC'D W/ 1004 GALS 15% HCL ACID, 144,358 GALS VISTAR AND 271278 OF 20/40 OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 56 | | Interval Bottom: | 7314 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 8/1/2020 Interval Top: 7015 ft. Interval Bottom: 7314 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/30/2008 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2008 | | Treatment Summary: | COMMINGLE THE NB/CD; CD PRODUCING THRU CAST IRON FLOW PLUG FROM 1ST PRODUCTION DATE OF 4/30/08 UNTIL TUBING WAS LANDED ON 8/19/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7264 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 45 | | BTU_GAS | 1256 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 4333 | | CALC_MCF_GAS | 195 | | CASING_PRESS | 250 | | GRAVITY_OIL | 51 | | MCF_GAS | 195 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 7015 ft. | # Of Holes: | 184 | | Interval Bottom: | 7314 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/16/2008 Interval Top: 7015 ft. Interval Bottom: 7072 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/2008 | | Treatment Summary: | FRAC'D W/ 1,000 GALS 15% HCL ACID, 187,874 GALS OF VISTAR & SLICKWATER, 239,280 OF 20/40 OTTAWA SAND AND 8600 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7015 ft. | # Of Holes: | 128 | | Interval Bottom: | 7072 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|