|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2023 Measured TD: 8140 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20077099 | Expiration Date: | 2/19/2009 | | Proposed Depth/Form: | 8136 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
| Wellbore Completed | | Completion Date: | 9/29/2008 | | Spud Date: | 9/25/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8140 ft. | Measured PB depth: | 8087 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMP DENS/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 754 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 754 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8131 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6510 ft., Bottom: 8131 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4220 ft. | | N | N | | SHANNON | 4774 ft. | | N | N | | NIOBRARA | 7240 ft. | | N | N | | CODELL | 7533 ft. | | N | N | | J SAND | 7965 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 5/1/2023 Interval Top: 7980 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2008 | | Treatment Summary: | JSND COMPLETION FRAC'D THE JSND WITH 155,568 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 242,180# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7980 ft. | # Of Holes: | 40 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 11/9/2008 Interval Top: 7310 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2008 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP'S TO COMMINGLE THE JSND-NBRR-CDL. 11-6-08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7957 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 57 | | BBLS_OIL | 77 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 57 | | CALC_BBLS_OIL | 77 | | CALC_GOR | 3662 | | CALC_MCF_GAS | 282 | | CASING_PRESS | 1063 | | GRAVITY_OIL | 50 | | MCF_GAS | 282 | | TUBING_PRESS | 412 |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | 152 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2023 Interval Top: 7310 ft. Interval Bottom: 7554 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2008 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP@7630'. 10/9/08. FRAC'D THE CODELL WITH 115,374 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,320# SAND. 10/9/08--SEE OPERATORS COMMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | 112 | | Interval Bottom: | 7554 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2157 |
| Total Gas Produced (MCF) | 7510 |
| GOR | 3481 |
| GOR Determination | BOE |
| Average BOE per Day | 9.428 |
| Average MCFE per Day | 54.689 |
| Federal Financial Assurance | i | |
|
|