|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/24/2024 Measured TD: 7910 ft. Vertical TD: 7814 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/24/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/14/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 1315 FSL 58 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68E | Footage: 1315 FSL 58 FWL | | Proposed Depth/Form: | 7910 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 909 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 396, Top: 15 ft., Bottom: 909 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7901 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: 3168 ft., Bottom: 7901 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/18/2008 | | Spud Date: | 3/13/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7910 ft. | Measured PB depth: | 7869 ft. | | True Vertical TD: | 7814 ft. | True Vertical PB depth: | 7773 ft. | | Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 1315 FSL 58 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68E | Footage: 1315 FSL 58 FWL | | Log Types: | CBL, CDL/CNL/ML, DIL/GL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 908 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 396, Top: 0 ft., Bottom: 908 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 2384 ft., Bottom: 7900 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3568 ft. | 3810 ft. | N | N | | SUSSEX | 4128 ft. | 4200 ft. | N | N | | SHANNON | 4566 ft. | 4605 ft. | N | N | | NIOBRARA | 7009 ft. | 7274 ft. | N | N | | FORT HAYS | 7274 ft. | 7295 ft. | N | N | | CODELL | 7295 ft. | 7713 ft. | N | N | | J SAND | 7731 ft. | 7905 ft. | N | N |
Formation JSND Formation Classification: OW Status: AB - 4/24/2024 Interval Top: 7738 ft. Interval Bottom: 7766 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/8/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/25/2014 | Treatment End Date: | N/A | | Treatment Summary: | Attempted to isolate the Codell and Niobrara from the J-sand, Pumped 43SX of sand, waited 2 hrs for the sand to settle, tagged fill at 7570’. (Top J-sand perfs were at 7738’)
The JSND will be permanently abandoned | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 2/16/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 162,246 gal Slickwater w/ 113,060#40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | 56 | | Interval Bottom: | 7766 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/7/2011 Interval Top: 7296 ft. Interval Bottom: 7316 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/16/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/25/2008 | | Treatment Summary: | 158,000 GALS FLUID & 115,400 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7296 ft. | # Of Holes: | 80 | | Interval Bottom: | 7316 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/1/2011 Interval Top: 7045 ft. Interval Bottom: 7766 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/8/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2011 | | Treatment Summary: | J RECOMPLETE. WENT DOWLINE WITH NB/CD ON 3/8/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7705 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1236 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 19000 | | CALC_MCF_GAS | 19 | | CASING_PRESS | 819 | | GRAVITY_OIL | 50 | | MCF_GAS | 19 | | TUBING_PRESS | 581 |
| | Perforation Data: | | Interval Top: | 7045 ft. | # Of Holes: | 214 | | Interval Bottom: | 7766 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/24/2024 Interval Top: 7045 ft. Interval Bottom: 7316 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/16/2008 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/12/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1336 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 56 | | CALC_GOR | 2465 | | CALC_MCF_GAS | 138 | | CASING_PRESS | 1550 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7045 ft. | # Of Holes: | 160 | | Interval Bottom: | 7316 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/7/2011 Interval Top: 7045 ft. Interval Bottom: 7168 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/16/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/25/2008 | | Treatment Summary: | 248,000 GALS FLUID & 201,600 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7045 ft. | # Of Holes: | 80 | | Interval Bottom: | 7168 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/24/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|