|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/8/2024 Measured TD: 7389 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/8/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 7/4/2013 | | Proposed Depth/Form: | 7389 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 564 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 243, Top: 0 ft., Bottom: 564 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7384 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: 2120 ft., Bottom: 7384 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/16/2008 | | Spud Date: | 3/13/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7389 ft. | Measured PB depth: | 7339 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 243, Top: 13 ft., Bottom: 565 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 2120 ft., Bottom: 7385 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2822 ft. | | N | N | | PARKMAN | 3587 ft. | | N | N | | SUSSEX | 4303 ft. | | N | N | | SHANNON | 4908 ft. | | N | N | | TEEPEE BUTTES | 5681 ft. | | N | N | | NIOBRARA | 6589 ft. | | N | N | | FORT HAYS | 6788 ft. | | N | N | | CODELL | 6790 ft. | | N | N | | J SAND | 7251 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/8/2024 Interval Top: 7250 ft. Interval Bottom: 7300 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/13/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7250 ft. | # Of Holes: | 108 | | Interval Bottom: | 7300 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/30/2023 Interval Top: 6794 ft. Interval Bottom: 6807 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/11/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/9/2008 | | Treatment Summary: | CD WAS FRAC'D W/ 144,060 GALS OF SILVERSTIM, SLICKWATER AND 15% HCL WITH 270840 LBS OF OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 52 | | Interval Bottom: | 6807 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/8/2024 Interval Top: 6526 ft. Interval Bottom: 6807 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/11/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2008 | | Treatment Summary: | COMMINGLE NB/CD. CD PRODUCING THRU CAST IRON FLOW PLUG |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 75 | | BTU_GAS | 1278 | | CALC_BBLS_H2O | 16 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 2800 | | CALC_MCF_GAS | 210 | | CASING_PRESS | 500 | | GRAVITY_OIL | 49 | | MCF_GAS | 210 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 6526 ft. | # Of Holes: | 180 | | Interval Bottom: | 6807 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/30/2023 Interval Top: 6526 ft. Interval Bottom: 6606 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/11/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/9/2008 | | Treatment Summary: | NB WAS FRAC'D W/ 186,361 GALS OF SLICKWATER AND SILVERSTIM WITH 250,280 LBS OF OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6526 ft. | # Of Holes: | 128 | | Interval Bottom: | 6606 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/08/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|