Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25154
Well Classification: OW Status: PA - 12/20/2022
Well Name/No:GUTTERSEN #24-29U
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/20/2022
FacilityID:290596LocationID:306717
County:WELD #123Location:SESW 29 4N63W 6
Field:WATTENBERG - #90750Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:658FSL  1959 FWLLat/Long: 40.277830 / -104.464030Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.277860 / -104.464060Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/20/2022             Measured TD: 7402 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/20/2022
Wellbore PermitDRIFTED
Permit #:20071800 Expiration Date:5/14/2008
Proposed Depth/Form:7400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SW

Wellbore Completed
Completion Date:6/4/2007
Spud Date:5/29/2007Spud Date Is:ACTUAL
Measured TD:7402 ft.Measured PB depth:7340 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 573 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 573 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7376 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 246, Top: 5820 ft., Bottom: 7376 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6499 ft.NN
FORT HAYS6747 ft.NN
CODELL6772 ft.NN
J SAND7233 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/20/2022                Interval Top: 6569 ft.    Interval Bottom: 6783 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/9/2007Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2007
Treatment Summary:NBRR PERFS 6569'-6574'(10 HOLES) & CODL PERFS 6774'-6783'(18 HOLES). FRAC'D NB-CD W/ 1000 GALS OF 15% HCL,952 BBLS SLICKWATER PAD, 3209 BBLS OF VISTAR 20# FLUID SYSTEM 337,940#'S OF 20/40 WHITE SAND & 16,000#'S OF SUPER LC 20/40 RESIN COATED PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:6760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 44
BTU_GAS 1297
CALC_BBLS_H2O 10
CALC_BBLS_OIL 44
CALC_GOR 1545
CALC_MCF_GAS 68
CASING_PRESS 750
GRAVITY_OIL 47
MCF_GAS 68
TUBING_PRESS 300
Perforation Data:
Interval Top:6569 ft.# Of Holes:28
Interval Bottom:6783 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/20/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No