Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25140
Well Classification: OW Status: PA - 3/9/2020
Well Name/No:CARMA #32-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/9/2020
FacilityID:290566LocationID:336289
Municipality/County:FIRESTONE / WELD #123Location:NWSW 35 3N68W 6
Field:WATTENBERG - #90750Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2329FSL  359 FWLLat/Long: 40.181410 / -104.978280Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.181390 / -104.978270Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/18/2013
End Date: 10/18/2013
Reported: 12/9/2013
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/9/2020             Measured TD: 7500 ft.    Vertical TD: 7460 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/9/2020
Wellbore PermitDIRECTIONAL
Permit #:20071723 Expiration Date:5/10/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2600 FSL  50 FWL
Bottom Hole Location:Sec:35 Twp: 3N 68W Footage: 2600 FSL  50 FWL
Proposed Depth/Form:7463 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:4/1/2008
Spud Date:3/25/2008Spud Date Is:ACTUAL
Measured TD:7500 ft.Measured PB depth:7453 ft.
True Vertical TD:7460 ft.True Vertical PB depth:7413 ft.
Top PZ Location:Sec:35 Twp: 3N 68WFootage: 2604 FSL  51 FWL
Bottom Hole Location:Sec:35 Twp: 3N 68WFootage: 2604 FSL  51 FWL
Log Types:CBL, P/E AILC/CNLD/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 643 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 643 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 7483 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 249, Top: 3370 ft., Bottom: 7483 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3670 ft.3874 ft.NN
SUSSEX4113 ft.4298 ft.NN
SHANNON4648 ft.4696 ft.NN
NIOBRARA7052 ft.NN
FORT HAYS7310 ft.NN
CODELL7332 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/7/2014                  Interval Top: 7334 ft.    Interval Bottom: 7354 ft.

 Completed Information for Formation CODELL
1st Production Date:10/23/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/18/2013Treatment End Date:10/18/2013
Treatment Summary:CODELL REFRAC 4651 BBL FR WATER, 4651 BBL TOTAL FLUID. 150080# 40/70 SAND, 4000# 20/40 SAND, 154080# TOTAL SAND.
Total fluid used in treatment (bbls):4651Max pressure during treatment (psi):5155
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):84
Fresh water used in treatment (bbls):4651Disposition method For flowback:RECYCLE
Total proppant used (lbs):154080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/29/2008
Treatment Summary:192,192 GALS FLUID & 154M280 LBS 40/70 SAND & 4100 LBS SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7334 ft.# Of Holes:80
Interval Bottom:7354 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/9/2020                  Interval Top: 7080 ft.    Interval Bottom: 7354 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/23/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/28/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 17
BTU_GAS 1273
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_GOR 9412
CALC_MCF_GAS 160
CASING_PRESS 612
GRAVITY_OIL 53
MCF_GAS 160
TUBING_PRESS 207
Perforation Data:
Interval Top:7080 ft.# Of Holes:170
Interval Bottom:7354 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/19/2008                Interval Top: 7080 ft.    Interval Bottom: 7214 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/23/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/29/2008
Treatment Summary:273,084 GALS FLUID & 203,780 LBS 40/70 SAND & 4000 LBS SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7080 ft.# Of Holes:90
Interval Bottom:7214 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/09/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No