Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25001
Well Classification: GW Status: PA - 11/29/2019
Well Name/No:MAYER #32-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/29/2019
FacilityID:290065LocationID:332749
County:WELD #123Location:SWNW 15 3N67W 6
Field:WATTENBERG - #90750Elevation:4795 ft.
Planned Location:2162FNL  786 FWLLat/Long: 40.226940 / -104.883430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.226989 / -104.883383Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/28/2019             Measured TD: 7350 ft.    Vertical TD: 7258 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/28/2019
Wellbore PermitDIRECTIONAL
Permit #:20071141 Expiration Date:4/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2500 FNL  50 FWL
Bottom Hole Location:Sec: Twp: Footage: 2500 FNL  50 FWL
Proposed Depth/Form:7176 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:2/22/2008
Spud Date:2/17/2008Spud Date Is:ACTUAL
Measured TD:7350 ft.Measured PB depth:7328 ft.
True Vertical TD:7258 ft.True Vertical PB depth:7236 ft.
Top PZ Location:Sec:15 Twp: 3N 67WFootage: 2472 FNL  72 FWL
Bottom Hole Location:Sec:15 Twp: 3N 67WFootage: 2472 FNL  72 FWL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 770 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 770 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7343 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 2630 ft., Bottom: 7343 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3601 ft.NN
SUSSEX4193 ft.NN
SHANNON4614 ft.NN
NIOBRARA6914 ft.NN
FORT HAYS7175 ft.NN
CODELL7195 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/8/2008                  Interval Top: 7197 ft.    Interval Bottom: 7212 ft.

 Completed Information for Formation CODELL
1st Production Date:5/16/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/2008
Treatment Summary:136,462 GALS FLUID & 221,129# 30/50 SAND & 4000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7197 ft.# Of Holes:60
Interval Bottom:7212 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/29/2019                Interval Top: 6937 ft.    Interval Bottom: 7212 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/16/2008Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/22/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1261
CALC_BBLS_H2O 0
CALC_BBLS_OIL 18
CALC_GOR 5723
CALC_MCF_GAS 103
CASING_PRESS 950
GRAVITY_OIL 51
Perforation Data:
Interval Top:6937 ft.# Of Holes:120
Interval Bottom:7212 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/8/2008                  Interval Top: 6937 ft.    Interval Bottom: 7066 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/16/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/2008
Treatment Summary:205,4220 GALS FLUID & 1000 GALS ACID & 127,189# 40/70 SAND & 4000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6937 ft.# Of Holes:60
Interval Bottom:7066 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/29/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No