Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25000
Well Classification: GW Status: PA - 8/13/2024
Well Name/No:WERTZ FEDERAL #36-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC28429
Facility Status:PAStatus Date8/13/2024
FacilityID:290066LocationID:336673
County:WELD #123Location:SESW 12 4N66W 6
Field:WATTENBERG - #90750Elevation:4708 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:472FSL  1932 FWLLat/Long: 40.320750 / -104.728080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.320730 / -104.728080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/13/2024             Measured TD: 7474 ft.    Vertical TD: 7352 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/13/2024
Wellbore PermitDIRECTIONAL
Permit #:20071373 Expiration Date:4/9/2008
Proposed Top PZ Location:Sec:12 Twp: 4N 66W Footage: 81 FSL  2655 FEL
Bottom Hole Location:Sec:12 Twp: 4N 66W Footage: 81 FSL  2655 FEL
Proposed Depth/Form:7434 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7434 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7434 ft.

Wellbore Completed
Completion Date:5/25/2007
Spud Date:5/20/2007Spud Date Is:ACTUAL
Measured TD:7474 ft.Measured PB depth:7416 ft.
True Vertical TD:7352 ft.True Vertical PB depth:7294 ft.
Top PZ Location:Sec:12 Twp: 4N 66WFootage: 81 FSL  2655 FEL
Bottom Hole Location:Sec:12 Twp: 4N 66WFootage: 81 FSL  2655 FEL
Log Types:CDL - CNL- ML - CBL - IEL - TMR
Casing:String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 551 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 551 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7466 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 3270 ft., Bottom: 7466 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3700 ft.NN
SUSSEX4220 ft.NN
SHANNON4930 ft.NN
NIOBRARA6993 ft.NN
FORT HAYS7290 ft.NN
CODELL7311 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/19/2022                 Interval Top: 7312 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation CODELL
1st Production Date:9/3/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2007
Treatment Summary:160,029 GAL FUILD & 118,140 LBS 40/70 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7312 ft.# Of Holes:54
Interval Bottom:7330 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/13/2024                 Interval Top: 7016 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/3/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2010
Treatment Summary:NBRR Perf 7016-7206 Holes 44 Size 0.42 CODL Perf 7312-7330 Holes 54 Size 0.38 Refrac CODL w/ 265,944 gal SW & 212,160# 40/70 sand & 4,000# SB Excel. NB-CD returned to production 8/19/2010 after CODL refrac.
Formation Treatment
Treatment Date:5/25/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 13
BTU_GAS 1245
CALC_BBLS_H2O 0
CALC_BBLS_OIL 13
CALC_GOR 22000
CALC_MCF_GAS 286
CASING_PRESS 368
GRAVITY_OIL 62
MCF_GAS 286
TUBING_PRESS 500
Perforation Data:
Interval Top:7016 ft.# Of Holes:98
Interval Bottom:7330 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/19/2022                 Interval Top: 7016 ft.    Interval Bottom: 7206 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2007
Treatment Summary:199,726 GAL FLUID & 156,160 LBS 40/70 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7016 ft.# Of Holes:44
Interval Bottom:7206 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No