|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/28/2016 Measured TD: 7590 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/28/2016 | Wellbore Permit | DRIFTED | Permit #: | 20071144 | Expiration Date: | 4/8/2008 | Proposed Depth/Form: | 7590 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE4 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 3/10/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7590 ft. | Measured PB depth: | 7549 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, P/E AILC-CNLD-ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 774 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 342, Top: 0 ft., Bottom: 774 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7579 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 3750 ft., Bottom: 7590 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7579 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 212, Top: 440 ft., Bottom: 1510 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 458 ft., Depth: 1500 ft., Bottom: 1508 ft., Sacks: 212, Method: PERF & PUMP | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3778 ft. | 3966 ft. | N | N | SUSSEX | 4314 ft. | 4422 ft. | N | N | SHANNON | 4748 ft. | 4790 ft. | N | N | NIOBRARA | 7138 ft. | | N | N | FORT HAYS | 7421 ft. | | N | N | CODELL | 7443 ft. | | N | N |
Formation CODL Formation Classification: OG Status: CM - 7/26/2011 Interval Top: 7442 ft. Interval Bottom: 7456 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/28/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2010 | Treatment Summary: | CD PERF 7442-7456 HOLES 56 SIZE 0.38
6/7/10 released RBP over CD to commingle CD w/ NB.
6/15/10 commingled NB/CD production | Formation Treatment | Treatment Date: | 2/3/2010 | Treatment Summary: | SET RPB @ 7390 W/ 2 SACKS OF SAND OVER FOR MECHANICAL INTEGRITY. OUR INTENT IS TO REMOVE THE RBP AND SAND TO COMINGLE WELL IN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1236 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 171 | CALC_GOR | 912 | CALC_MCF_GAS | 156 | CASING_PRESS | 2500 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7442 ft. | # Of Holes: | 56 | Interval Bottom: | 7456 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OG Status: AB - 11/28/2016 Interval Top: 7164 ft. Interval Bottom: 7456 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/15/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2010 | Treatment Summary: | NB PERF 7164-7320 HOLES 60 SIZE 0.42
CD PERF 7442-7456 HOLES 56 SIZE 0.38
6/7/10 released RBP over CD to commingle CD w/ NB.
6/15/10 commingled NB/CD production |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7419 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/15/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1302 | CALC_BBLS_OIL | 10 | CALC_GOR | 4000 | CALC_MCF_GAS | 40 | CASING_PRESS | 1200 | GRAVITY_OIL | 50 | MCF_GAS | 40 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 7164 ft. | # Of Holes: | 116 | Interval Bottom: | 7456 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 7/26/2011 Interval Top: 7164 ft. Interval Bottom: 7320 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/22/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/15/2010 | Treatment Summary: | NB PERF 7164-7320 HOLES 60 SIZE 0.42
6/7/10 released RBP over CD to commingle CD w/ NB.
6/15/10 commingled NB/CD production | Formation Treatment | Treatment Date: | 2/9/2010 | Treatment Summary: | FRAC NBRR W/233,789 GAL SW & 200,660# 30/50 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1302 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 14 | CALC_GOR | 4183 | CALC_MCF_GAS | 58 | CASING_PRESS | 200 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7164 ft. | # Of Holes: | 60 | Interval Bottom: | 7320 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/28/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|