|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/2/2018 Measured TD: 7840 ft. Vertical TD: 7278 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20071418 | Expiration Date: | 4/5/2008 | | Proposed Top PZ Location: | Sec:17 Twp: 5N 65W | Footage: 31 1540 | | Bottom Hole Location: | Sec:17 Twp: 5N 65W | Footage: 31 1540 | | Proposed Depth/Form: | 8258 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/18/2007 | | Spud Date: | 4/11/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7840 ft. | Measured PB depth: | 7800 ft. | | True Vertical TD: | 7278 ft. | True Vertical PB depth: | 7235 ft. | | Top PZ Location: | Sec:17 Twp: 5N 65W | Footage: 31 FSL 1540 FWL | | Bottom Hole Location: | Sec:17 Twp: 5N 65W | Footage: 31 FSL 1540 FWL | | Log Types: | DIL, CDL, CNL, CBL | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 479 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 479 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7829 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 735, Top: 3390 ft., Bottom: 7829 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3908 ft. | 4010 ft. | N | N | | SUSSEX | 4688 ft. | 4794 ft. | N | N | | NIOBRARA | 7295 ft. | 7622 ft. | N | N | | FORT HAYS | 7622 ft. | 7644 ft. | N | N | | CODELL | 7644 ft. | 7662 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/29/2007 Interval Top: 7648 ft. Interval Bottom: 7658 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/22/2007 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | 143,431 GAL FLUID, 279,354# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7292 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/29/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | BTU_GAS | 1238 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 13636 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 56 | | MCF_GAS | 300 |
| | Perforation Data: | | Interval Top: | 7648 ft. | # Of Holes: | 40 | | Interval Bottom: | 7658 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/20/2018 Interval Top: 7308 ft. Interval Bottom: 7658 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/22/2007 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7279 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/29/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | BTU_GAS | 1238 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 13636 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 56 | | MCF_GAS | 300 |
| | Perforation Data: | | Interval Top: | 7308 ft. | # Of Holes: | 112 | | Interval Bottom: | 7658 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/29/2007 Interval Top: 7308 ft. Interval Bottom: 7468 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/22/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2007 | | Treatment Summary: | 170,542 GAL FLUID, 252,000# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7308 ft. | # Of Holes: | 72 | | Interval Bottom: | 7468 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/20/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|