|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/25/2018 Measured TD: 7320 ft. Vertical TD: 7284 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/25/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20071417 | Expiration Date: | 4/5/2008 | | Proposed Top PZ Location: | Sec:17 Twp: 5 65 | Footage: 48 1252 | | Bottom Hole Location: | Sec:17 Twp: 5 65 | Footage: 48 1252 | | Proposed Depth/Form: | 7522 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/25/2007 | | Spud Date: | 4/19/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7320 ft. | Measured PB depth: | 7210 ft. | | True Vertical TD: | 7284 ft. | True Vertical PB depth: | 7174 ft. | | Top PZ Location: | Sec:17 Twp: 5 65 | Footage: 48 FSL 1252 FEL | | Bottom Hole Location: | Sec:17 Twp: 5 65 | Footage: 48 FSL 1252 FEL | | Log Types: | DIL, CDL, CNL, CBL | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 479 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 479 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7310 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 2750 ft., Bottom: 7310 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3696 ft. | 3800 ft. | N | N | | SUSSEX | 4296 ft. | 4440 ft. | N | N | | NIOBRARA | 6793 ft. | 7090 ft. | N | N | | FORT HAYS | 7090 ft. | 7112 ft. | N | N | | CODELL | 7112 ft. | 7129 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/30/2007 Interval Top: 7114 ft. Interval Bottom: 7124 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2007 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | 129,281 GAL FLUID, 270,000# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6780 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1238 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 6167 | | CALC_MCF_GAS | 185 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 56 | | MCF_GAS | 185 |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 40 | | Interval Bottom: | 7124 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/25/2018 Interval Top: 6806 ft. Interval Bottom: 7124 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2007 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6780 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1238 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 6167 | | CALC_MCF_GAS | 185 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 56 | | MCF_GAS | 185 |
| | Perforation Data: | | Interval Top: | 6806 ft. | # Of Holes: | 112 | | Interval Bottom: | 7124 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/30/2007 Interval Top: 6806 ft. Interval Bottom: 6948 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | 172,978 GAL FLUID, 251,800# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6806 ft. | # Of Holes: | 72 | | Interval Bottom: | 6948 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/25/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|