|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/30/2021 Measured TD: 7600 ft. Vertical TD: 7520 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/30/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20071014 | Expiration Date: | 4/3/2008 | | Proposed Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 526 FSL 493 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 526 FSL 493 FWL | | Proposed Depth/Form: | 7541 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2008 | | Spud Date: | 2/9/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7600 ft. | Measured PB depth: | 7552 ft. | | True Vertical TD: | 7520 ft. | True Vertical PB depth: | 7472 ft. | | Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 526 FSL 493 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 526 FSL 493 FWL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7582 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 241, Top: 4180 ft., Bottom: 7582 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1378 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 748 ft., Bottom: 1390 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 748 ft., Depth: 1378 ft., Bottom: 1390 ft., Sacks: 70, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3850 ft. | | N | N | | SUSSEX | 4300 ft. | | N | N | | SHANNON | 4722 ft. | | N | N | | NIOBRARA | 7164 ft. | | N | N | | FORT HAYS | 7381 ft. | | N | N | | CODELL | 7403 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/23/2008 Interval Top: 7414 ft. Interval Bottom: 7434 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/25/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/2008 | | Treatment Summary: | 171,000 GALS FLUID & 111,000# 40/70 SAND & 4000# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7414 ft. | # Of Holes: | 80 | | Interval Bottom: | 7434 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/30/2021 Interval Top: 7172 ft. Interval Bottom: 7434 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/25/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1232 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 186 | | CALC_GOR | 1355 | | CALC_MCF_GAS | 252 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 182 | | Interval Bottom: | 7434 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/23/2008 Interval Top: 7172 ft. Interval Bottom: 7276 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/25/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/2008 | | Treatment Summary: | 383,000 GALS FLUID & 304,000# 40/70 SAND & 8000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 102 | | Interval Bottom: | 7276 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/30/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|