|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/6/2021 Measured TD: 7073 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/6/2021 | | Wellbore Permit | | | Permit #: | 20083075 | Expiration Date: | 6/12/2009 | | Proposed Depth/Form: | 7100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2008 | | Spud Date: | 8/20/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7073 ft. | Measured PB depth: | 7010 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY ; CEMENT BOND-VD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 742 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 742 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7029 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 3017 ft., Bottom: 7029 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2876 ft. | | N | N | | PARKMAN | 3604 ft. | | N | N | | SUSSEX | 4321 ft. | | N | N | | SHANNON | 4976 ft. | | N | N | | NIOBRARA | 6602 ft. | | N | N | | FORT HAYS | 6850 ft. | | N | N | | CODELL | 6894 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/27/2008 Interval Top: 6894 ft. Interval Bottom: 6904 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/24/2008 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/10/2008 | | Treatment Summary: | FRAC CODELL WITH 4118 BBLS SLICKWATER, AND 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4876# 60.7BPM. MAX. PRESSURE 5389#. MAX. RATE 61.1 BPM. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6883 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/27/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 31 | | BBLS_OIL | 142 | | BTU_GAS | 1242 | | CALC_GOR | 662 | | CASING_PRESS | 675 | | GRAVITY_OIL | 47 | | MCF_GAS | 94 |
| | Perforation Data: | | Interval Top: | 6894 ft. | # Of Holes: | 40 | | Interval Bottom: | 6904 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/6/2021 Interval Top: 6604 ft. Interval Bottom: 6904 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/5/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2009 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 33 | | BTU_GAS | 1242 | | CALC_GOR | 818 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 47 | | MCF_GAS | 27 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 6604 ft. | # Of Holes: | 166 | | Interval Bottom: | 6904 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 10/11/2009 Interval Top: 6604 ft. Interval Bottom: 6736 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/8/2009 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2009 | | Treatment Summary: | FRAC NIOBRARA WITH 4156 BBLS DYNA FLOW 2 WR FLUID, 238,000# 30/50 SAND, AND 12,000# RESIN COATED SND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7 % KCL IN PRE-PAD. TREAT AT AN AVERAGE 4180PSI 61.4BPM. MAX. PRESSURE 6307PSI. MAX. RATE 61.8BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 22 | | BTU_GAS | 1242 | | CALC_GOR | 909 | | CASING_PRESS | 200 | | GRAVITY_OIL | 47 | | MCF_GAS | 20 |
| | Perforation Data: | | Interval Top: | 6604 ft. | # Of Holes: | 128 | | Interval Bottom: | 6736 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/06/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|