Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24928
Well Classification: OW Status: PA - 9/19/2019
Well Name/No:HEINZE #31-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/19/2019
FacilityID:289848LocationID:306569
County:WELD #123Location:SWSE 31 7N63W 6
Field:WATTENBERG - #90750Elevation:4740 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:668FSL  1853 FELLat/Long: 40.524610 / -104.476970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.524640 / -104.476940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/19/2019             Measured TD: 7138 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/19/2019
Wellbore Permit
Permit #:20083074 Expiration Date:6/12/2009
Proposed Depth/Form:7100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2SE4

Wellbore Completed
Completion Date:8/30/2008
Spud Date:8/25/2008Spud Date Is:ACTUAL
Measured TD:7138 ft.Measured PB depth:7064 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND-VD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 720 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 720 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7082 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 3222 ft., Bottom: 7082 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2890 ft.NN
PARKMAN3600 ft.NN
SUSSEX4383 ft.NN
SHANNON4980 ft.NN
NIOBRARA6613 ft.NN
FORT HAYS6876 ft.NN
CODELL6902 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/15/2010                 Interval Top: 6894 ft.    Interval Bottom: 6905 ft.

 Completed Information for Formation CODELL
1st Production Date:9/24/2008Choke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2008
Treatment Summary:FRAC CODELL WITH 3983.3 BBLS SLICKWATER, AND 115000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4991# 60.3BPM. MAX. PRESSURE 5502# MAX. RATE 61.4BPM
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 31
BBLS_OIL 142
BTU_GAS 1242
CALC_GOR 662
CASING_PRESS 675
GRAVITY_OIL 47
MCF_GAS 94
Perforation Data:
Interval Top:6894 ft.# Of Holes:44
Interval Bottom:6905 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/26/2009                 Interval Top: 6614 ft.    Interval Bottom: 6748 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/12/2009Choke Size:0.219 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/11/2009
Treatment Summary:FRAC W/ 4056 BBLS DYNAFLOW 2 WR FLUID; 299,080# 30/50 SND; & 12,000# 20/40 RESIN CTD SND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC & 500 BBLS 7% KCL IN PRE-PAD. TREAT AN AVG. OF 4314 PSI 60.7 BPM. MAX. PRESSURE 6247 PSI. MAX. RATE 61.2 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:6893 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 70
BTU_GAS 1242
CALC_GOR 2400
CASING_PRESS 225
GRAVITY_OIL 47
MCF_GAS 168
Perforation Data:
Interval Top:6614 ft.# Of Holes:184
Interval Bottom:6748 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/19/2019

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/23/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6893 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/15/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 31
BTU_GAS 1242
CALC_GOR 871
CASING_PRESS 1350
GRAVITY_OIL 47
MCF_GAS 27
TUBING_PRESS 300
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/19/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No