|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/2/2017 Measured TD: 7615 ft. Vertical TD: 7431 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/2/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070595 | Expiration Date: | 3/15/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 660 FNL 1980 FWL | | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 660 FNL 1980 FWL | | Proposed Depth/Form: | 7608 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2007 | | Spud Date: | 7/26/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7615 ft. | Measured PB depth: | 7594 ft. | | True Vertical TD: | 7431 ft. | True Vertical PB depth: | 7410 ft. | | Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 624 FNL 1984 FWL | | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 624 FNL 1984 FWL | | Log Types: | CBL,DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7609 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 515, Top: 3856 ft., Bottom: 7609 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3732 ft. | | N | N | | SUSSEX | 4220 ft. | | N | N | | SHANNON | 4756 ft. | | N | N | | NIOBRARA | 7154 ft. | | N | N | | FORT HAYS | 7410 ft. | | N | N | | CODELL | 7430 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 5/25/2010 Interval Top: 7430 ft. Interval Bottom: 7452 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/20/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/20/2010 | | Treatment Summary: | NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 11/5/2007 | | Treatment Summary: | 208,909 GAL FLUID & 4,000 LBS R/C 20/40 SAND & 154,838 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1281 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 51 | | CALC_GOR | 890 | | CALC_MCF_GAS | 45 | | CASING_PRESS | 150 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 66 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2017 Interval Top: 7182 ft. Interval Bottom: 7452 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/28/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/20/2010 | | Treatment Summary: | NBRR PERF 7182-7312 HOLES 64 SIZE 0.41. CODL PERF 7430-7452 HOLES 66 SIZE 0.38. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7385 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1306 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 686 | | CALC_MCF_GAS | 33 | | CASING_PRESS | 1570 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 129 |
| | Perforation Data: | | Interval Top: | 7182 ft. | # Of Holes: | 130 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/22/2010 Interval Top: 7182 ft. Interval Bottom: 7312 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/28/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/20/2010 | | Treatment Summary: | FRAC NBRR W/ 500 GAL 15% HCI AND 243528 GAL SW AND 200380# 40/70 SAND & 4000# 20/40 SUPERLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7182 ft. | # Of Holes: | 64 | | Interval Bottom: | 7312 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/28/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|