|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/18/2019 Measured TD: 7930 ft. Vertical TD: 7863 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/18/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/29/2012 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FNL 510 FWL | | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 1980 FNL 510 FWL | | Proposed Depth/Form: | 7930 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7927 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 655, Top: 3440 ft., Bottom: 7927 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/13/2007 | | Spud Date: | 7/6/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7930 ft. | Measured PB depth: | 7893 ft. | | True Vertical TD: | 7863 ft. | True Vertical PB depth: | 7826 ft. | | Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 1949 FNL 529 FWL | | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 1949 FNL 529 FWL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7927 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 655, Top: 3440 ft., Bottom: 7927 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3695 ft. | | N | N | | SUSSEX | 4120 ft. | | N | N | | SHANNON | 4668 ft. | | N | N | | TEEPEE BUTTES | 7000 ft. | | N | N | | NIOBRARA | 7138 ft. | | N | N | | FORT HAYS | 7324 ft. | | N | N | | CODELL | 7347 ft. | | N | N | | J SAND | 7749 ft. | | N | N |
Formation JSND Formation Classification: OG Status: AB - 7/18/2019 Interval Top: 7760 ft. Interval Bottom: 7780 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/27/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 161,154 gal Slickwater w/ 159,980# 40/70, 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7760 ft. | # Of Holes: | 60 | | Interval Bottom: | 7780 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/2/2011 Interval Top: 7348 ft. Interval Bottom: 7363 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/19/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2007 | | Treatment Summary: | 166,963 GAL FLUID & 4000 LBS 20/40 EXCEL SAND & 111,060 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7348 ft. | # Of Holes: | 60 | | Interval Bottom: | 7363 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/8/2011 Interval Top: 7138 ft. Interval Bottom: 7780 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/27/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2011 | | Treatment Summary: | JSND REC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7743 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1304 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 45600 | | CALC_MCF_GAS | 456 | | CASING_PRESS | 1084 | | GRAVITY_OIL | 52 | | MCF_GAS | 456 | | TUBING_PRESS | 1101 |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 124 | | Interval Bottom: | 7780 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/18/2019 Interval Top: 7138 ft. Interval Bottom: 7363 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/19/2007 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/13/2007 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/2/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1281 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 97 | | CALC_GOR | 5090 | | CALC_MCF_GAS | 493 | | CASING_PRESS | 900 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 124 | | Interval Bottom: | 7363 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/2/2011 Interval Top: 7138 ft. Interval Bottom: 7222 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/19/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2007 | | Treatment Summary: | 1000 GAL ACID 168,969 GAL FLUID & 4000 LBS 30/50 EXCEL SAND & 254,720 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 64 | | Interval Bottom: | 7222 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/18/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|