|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8097 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | | Wellbore Permit | | | Permit #: | 20070597 | Expiration Date: | 3/14/2008 | | Proposed Depth/Form: | 8076 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5186 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: , Bottom: 5186 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/19/2007 | | Spud Date: | 4/13/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8097 ft. | Measured PB depth: | 8047 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DI/CD/CN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 615 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 0 ft., Bottom: 615 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8084 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6554 ft., Bottom: 8097 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5310 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 4066 ft., Bottom: 5310 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4394 ft. | | N | N | | SHANNON | 4938 ft. | | N | N | | NIOBRARA | 7224 ft. | | N | N | | CODELL | 7494 ft. | | N | N | | J SAND | 7918 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7918 ft. Interval Bottom: 7970 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/25/2007 | | Treatment Summary: | FRAC'D J SAND W/252,820# 20/40, 12,000# 20/40 SUPER LC 4/28/2007. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7918 ft. | # Of Holes: | 88 | | Interval Bottom: | 7970 ft. | Hole Size: | 0.73 in. |
|
Formation CODL Formation Classification: GW Status: CM - 1/7/2025 Interval Top: 7494 ft. Interval Bottom: 7514 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 80 | | Interval Bottom: | 7514 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7274 ft. Interval Bottom: 7514 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/13/2011 | | Treatment Summary: | NIOBRARA – 7274-7298’ - FRAC’D W/135,866 GALS FRAC FLUID AND 257,238# SAND (8/13/2011).
CODELL - 7494-7514' FRAC'D W/161,025 GALS FRAC FLUID AND 238,480# SAND (8/13/2011).
CIBP SET AT 7550’ 8/13/2011. CBP SET @ 7335’ ON 8/13/2011. DRILLED OUT 8/18/2011.
| | Formation Treatment | | Treatment Date: | 4/28/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7600'. 04/28/2007. FRAC'D THE CODELL W/253,180# 20/40 FRAC SAND, 12,000# 20/40 SUPER LC 04/28/2007. SET CFP @ 7400'. 04/28/2007. FRAC'D NIOBRARA W/ 244,720# 20/40 FRAC SAND, 12,000# 20/40 SUPER LC 04/28/2007. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 128 | | Interval Bottom: | 7514 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/7/2025 Interval Top: 7274 ft. Interval Bottom: 7298 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 48 | | Interval Bottom: | 7298 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/11/2012 Interval Top: 7241 ft. Interval Bottom: 7970 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | CIBP SET AT 7550’ 8/13/2011. CBP SET @ 7335’ ON 8/13/2011. DRILLED OUT 8/18/2011. | | Formation Treatment | | Treatment Date: | 4/19/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7400' & 7600' 06/08/2007. DRILLED OUT CFP'S TO COMMINGLE THE JSND-NBRR-CDL 06/08/2007 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7902 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 38 | | BBLS_OIL | 13 | | BTU_GAS | 1256 | | CALC_BBLS_H2O | 38 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 17384 | | CALC_MCF_GAS | 226 | | CASING_PRESS | 958 | | GRAVITY_OIL | 48 | | MCF_GAS | 226 | | TUBING_PRESS | 447 |
| | Perforation Data: | | Interval Top: | 7241 ft. | # Of Holes: | 216 | | Interval Bottom: | 7970 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/26/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|