Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24886
Well Classification: OW Status: PA - 8/8/2023
Well Name/No:FRANK #5-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/8/2023
FacilityID:289571LocationID:333042
County:WELD #123Location:SENW 5 5N67W 6
Field:WATTENBERG - #90750Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2448FNL  2399 FWLLat/Long: 40.429264 / -104.916783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.429271 / -104.916790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/8/2023             Measured TD: 8170 ft.    Vertical TD: 7833 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/8/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2013
Proposed Top PZ Location:Sec:5 Twp: 5N 67W Footage: 1979 FNL  682 FWL
Bottom Hole Location:Sec:5 Twp: 5N 67W Footage: 1978 FNL  678 FWL
Proposed Depth/Form:8170 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 800, Drill Unit: W/2NW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 769 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 540, Top: 0 ft., Bottom: 769 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8168 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 935, Top: 1145 ft., Bottom: 8168 ft.

Wellbore Completed
Completion Date:5/5/2007
Spud Date:4/29/2007Spud Date Is:ACTUAL
Measured TD:8170 ft.Measured PB depth:8136 ft.
True Vertical TD:7833 ft.True Vertical PB depth:7799 ft.
Top PZ Location:Sec:5 Twp: 5N 67WFootage: 1979 FNL  682 FWL
Bottom Hole Location:Sec:5 Twp: 5N 67WFootage: 1979 FNL  682 FWL
Log Types:ML - MUD - CNL - LDT - IEL - CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 769 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 769 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8168 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 935, Top: 1145 ft., Bottom: 8168 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3684 ft.NN
SUSSEX4346 ft.NN
SHANNON4854 ft.NN
NIOBRARA7218 ft.NN
FORT HAYS7521 ft.NN
CODELL7542 ft.NN
J SAND8004 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/4/2011                 Interval Top: 7542 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation CODELL
1st Production Date:7/12/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2007
Treatment Summary:PERF & FRAC W/165,769 GAL FLUID & 118,540 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7542 ft.# Of Holes:66
Interval Bottom:7564 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/8/2023                  Interval Top: 7222 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/12/2007Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7518 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2007Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1392
CALC_BBLS_H2O 0
CALC_BBLS_OIL 73
CALC_GOR 1794
CALC_MCF_GAS 131
CASING_PRESS 1500
GRAVITY_OIL 53
TUBING_PRESS 445
Perforation Data:
Interval Top:7222 ft.# Of Holes:246
Interval Bottom:7564 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/4/2011                 Interval Top: 7222 ft.    Interval Bottom: 7360 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/12/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2007
Treatment Summary:PERF & FRAC NBRR A BENCH W/125,806 GAL FLUID & 100,000 LBS 30/50 SAND. PERF & FRAC NBRR B BENCH W/125,328 GAL FLUID & 100,000 LBS 30/50 SAND. PERF & FRAC NBRR C BENCH W/125,086 GAL FLUID & 100,000 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7222 ft.# Of Holes:180
Interval Bottom:7360 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/08/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No