|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/13/2017 Measured TD: 8091 ft. Vertical TD: 7834 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/13/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/3/2013 | | Proposed Top PZ Location: | Sec:5 Twp: 5N 67W | Footage: 1335 FNL 1377 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 1340 FNL 1377 FWL | | Proposed Depth/Form: | 8091 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 768 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8080 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 665, Top: 1000 ft., Bottom: 8080 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/29/2007 | | Spud Date: | 4/22/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8091 ft. | Measured PB depth: | 8064 ft. | | True Vertical TD: | 7834 ft. | True Vertical PB depth: | 7807 ft. | | Top PZ Location: | Sec:5 Twp: 5N 67W | Footage: 1335 FNL 1377 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 1340 FNL 1377 FWL | | Log Types: | CDL - CNL - ML - IEL - MUD - CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 768 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8080 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 1000 ft., Bottom: 8080 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3658 ft. | | N | N | | SUSSEX | 4298 ft. | | N | N | | SHANNON | 4802 ft. | | N | N | | NIOBRARA | 7146 ft. | | N | N | | FORT HAYS | 7449 ft. | | N | N | | CODELL | 7471 ft. | | N | N | | J SAND | 7936 ft. | | N | N |
Formation CODL Formation Classification: GW Status: AB - 3/13/2017 Interval Top: 7472 ft. Interval Bottom: 7492 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/12/2007 | Choke Size: | 0.530 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 6/26/2007 | | Treatment Summary: | 165,496 GALS FLUID & 115,800 LBS 30/50 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7442 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/16/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1392 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 2581 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 990 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 60 | | Interval Bottom: | 7492 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/13/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|