|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/25/2024 Measured TD: 7502 ft. Vertical TD: 7400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/25/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070483 | Expiration Date: | 3/4/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2600 FSL 60 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 67W | Footage: 2600 FSL 60 FWL | | Proposed Depth/Form: | 7491 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/14/2007 | | Spud Date: | 4/9/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7502 ft. | Measured PB depth: | 7454 ft. | | True Vertical TD: | 7400 ft. | True Vertical PB depth: | 7352 ft. | | Top PZ Location: | Sec:19 Twp: 3N 67W | Footage: 2609 FSL 73 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 67W | Footage: 2609 FSL 73 FWL | | Log Types: | CNL - CDL - IEL - CBL - ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 758 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 758 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7499 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 472, Top: 3465 ft., Bottom: 7499 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3700 ft. | | N | N | | SUSSEX | 4170 ft. | | N | N | | SHANNON | 4694 ft. | | N | N | | NIOBRARA | 7068 ft. | | N | N | | FORT HAYS | 7316 ft. | | N | N | | CODELL | 7339 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/21/2011 Interval Top: 7339 ft. Interval Bottom: 7360 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/17/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/29/2007 | | Treatment Summary: | 130,376 GALS FLUID & 220,000#'S 20/40 SAND. | | Formation Treatment | | Treatment Date: | 5/28/2007 | | Treatment Summary: | CD Perf 7339-7360 Holes 63 Size 0.45
Frac w/ 220,042# 20/40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1172 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 4220 | | CALC_MCF_GAS | 152 | | CASING_PRESS | 850 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7339 ft. | # Of Holes: | 63 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/25/2024 Interval Top: 7092 ft. Interval Bottom: 7360 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/11/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/2011 | | Treatment Summary: | NB Perf 7092-7206 Hole 66 Size 0.41 CD Perf 7339-7360 Holes 63 Size 0.45
4/4/2011 -mill out CIBP over CODL to commingle well |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7324 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 9 | | BTU_GAS | 1268 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 9667 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 1141 | | GRAVITY_OIL | 43 | | MCF_GAS | 87 | | TUBING_PRESS | 604 |
| | Perforation Data: | | Interval Top: | 7092 ft. | # Of Holes: | 129 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/9/2011 Interval Top: 7092 ft. Interval Bottom: 7206 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/23/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2011 | | Treatment Summary: | NB Perf 7092-7206 Hole 66 Size 0.41
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 239,368 gal Slickwater w/ 100,160# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7092 ft. | # Of Holes: | 66 | | Interval Bottom: | 7206 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|