Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24850
Well Classification: GW Status: PA - 5/11/2017
Well Name/No:ROBERT #23-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/11/2017
FacilityID:289488LocationID:336683
County:WELD #123Location:NESW 11 4N66W 6
Field:WATTENBERG - #90750Elevation:4715 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2123FSL  1982 FWLLat/Long: 40.325000 / -104.746870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.324980 / -104.746890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/11/2017             Measured TD: 7935 ft.    Vertical TD: 7836 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/11/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/8/2010
Proposed Top PZ Location:Sec:11 Twp: 4N 66W Footage: 1411 FSL  2530 FWL
Bottom Hole Location:Sec:11 Twp: 4N 66W Footage: 1411 FSL  2530 FWL
Proposed Depth/Form:7935 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 415 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 415 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7929 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 840, Top: 1950 ft., Bottom: 7929 ft.

Wellbore Completed
Completion Date:4/28/2007
Spud Date:4/21/2007Spud Date Is:ACTUAL
Measured TD:7935 ft.Measured PB depth:7907 ft.
True Vertical TD:7836 ft.True Vertical PB depth:7808 ft.
Top PZ Location:Sec:11 Twp: 4N 66WFootage: 1411 FSL  2530 FWL
Bottom Hole Location:Sec:11 Twp: 4N 66WFootage: 1411 FSL  2530 FWL
Log Types:CNL - DIL - CDL - GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 12 ft., Bottom: 414 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7924 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 1950 ft., Bottom: 7824 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3720 ft.NN
SUSSEX4204 ft.NN
SHANNON4908 ft.NN
NIOBRARA6987 ft.NN
FORT HAYS7278 ft.NN
CODELL7300 ft.NN
J SAND7768 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/11/2017                 Interval Top: 7770 ft.    Interval Bottom: 7836 ft.

 Completed Information for Formation J SAND
1st Production Date:3/16/2010Choke Size:0.000 in.
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2010
Treatment Summary:FRAC W/ 161,179 GAL SW W/ 115,880# 40/70 & 4,000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7761 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2010Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1209
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 711
GRAVITY_OIL 64
TUBING_PRESS 690
Perforation Data:
Interval Top:7770 ft.# Of Holes:72
Interval Bottom:7836 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/11/2010                 Interval Top: 7300 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation CODELL
1st Production Date:8/2/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:156,920 GALS FLUID & 115,460 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7300 ft.# Of Holes:60
Interval Bottom:7320 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/11/2017                 Interval Top: 6990 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/2/2007Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1209
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_GOR 8412
CALC_MCF_GAS 143
CASING_PRESS 711
GRAVITY_OIL 64
TUBING_PRESS 690
Perforation Data:
Interval Top:6990 ft.# Of Holes:146
Interval Bottom:7320 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/11/2010                 Interval Top: 6990 ft.    Interval Bottom: 7190 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/2/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:240,076 GALS FLUID & 199,520 LBS 40/70 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6990 ft.# Of Holes:86
Interval Bottom:7190 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/11/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No