|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2021 Measured TD: 8085 ft. Vertical TD: 7981 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/29/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2590 FNL 50 FWL | | Bottom Hole Location: | Sec:31 Twp: 3N 65W | Footage: 2590 FNL 50 FWL | | Proposed Depth/Form: | 8085 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 901 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 360, Top: 14 ft., Bottom: 909 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8079 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 308, Top: 3930 ft., Bottom: 8085 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/9/2008 | | Spud Date: | 2/2/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8085 ft. | Measured PB depth: | 8050 ft. | | True Vertical TD: | 7981 ft. | True Vertical PB depth: | 7946 ft. | | Top PZ Location: | Sec:31 Twp: 3N 65W | Footage: 2590 FNL 50 FWL | | Bottom Hole Location: | Sec:31 Twp: 3N 65W | Footage: 2559 FNL 73 FWL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 901 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 8079 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 308, Top: 3930 ft., Bottom: 8079 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4110 ft. | | N | N | | SUSSEX | 4590 ft. | | N | N | | TEEPEE BUTTES | 6825 ft. | | N | N | | NIOBRARA | 7165 ft. | | N | N | | FORT HAYS | 7419 ft. | | N | N | | CODELL | 7442 ft. | | N | N | | J SAND | 7900 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 8/1/2020 Interval Top: 7902 ft. Interval Bottom: 7954 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/28/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/11/2010 | | Treatment Summary: | FRAC JSND W/ 162540 GAL SW AND 115480# 30/50 SAND AND 4000# SUPERLC. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1247 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 1375 | | CALC_MCF_GAS | 11 | | CASING_PRESS | 665 | | GRAVITY_OIL | 40 | | TUBING_PRESS | 262 |
| | Perforation Data: | | Interval Top: | 7902 ft. | # Of Holes: | 62 | | Interval Bottom: | 7954 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7441 ft. Interval Bottom: 7457 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/20/2008 | | Treatment Summary: | 171,827 GALS FLUID; 115,360 LBS30/50 SAND; 4,000 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7441 ft. | # Of Holes: | 64 | | Interval Bottom: | 7457 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2021 Interval Top: 7166 ft. Interval Bottom: 7457 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2010 | | Treatment Summary: | NBRR PERF 7166-7312 HOLES 63 SIZE 0.42. CODL PERF 7441-7457 HOLES 64 SIZE 0.38. NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 2/9/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1247 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 1500 | | CALC_MCF_GAS | 12 | | CASING_PRESS | 665 | | GRAVITY_OIL | 40 | | TUBING_PRESS | 262 |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 127 | | Interval Bottom: | 7457 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7166 ft. Interval Bottom: 7312 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/20/2008 | | Treatment Summary: | 172,484 GALS FLUID; 1,000 GAL ACID; 250,280 LBS 30/50 SAND; 4,000 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 67 | | Interval Bottom: | 7312 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|