Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24812
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:JOHNSON #12-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:289320LocationID:336378
Municipality/County:FIRESTONE / WELD #123Location:SWNW 12 2N68W 6
Field:WATTENBERG - #90750Elevation:4863 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1998FNL  742 FWLLat/Long: 40.155090 / -104.958450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.155081 / -104.958462Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 7960 ft.    Vertical TD: 7911 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDRIFTED
Permit #:20070246 Expiration Date:2/13/2008
Proposed Depth/Form:7954 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4979 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 4059 ft., Bottom: 4979 ft.

Wellbore Completed
Completion Date:3/5/2007
Spud Date:2/27/2007Spud Date Is:ACTUAL
Measured TD:7960 ft.Measured PB depth:
True Vertical TD:7911 ft.True Vertical PB depth:
Log Types:CBL,DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 691 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 691 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7938 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 6200 ft., Bottom: 7938 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5062 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 3690 ft., Bottom: 5080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4240 ft.NN
SHANNON4708 ft.NN
NIOBRARA7095 ft.NN
CODELL7364 ft.NN
J SAND7796 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7798 ft.    Interval Bottom: 7834 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2007
Treatment Summary:JSND COMPLETION FRAC'D THE JSND WITH 172,158 GAL FRAC FLUID AND 238,580# 20/40 SAND. 03/09/07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7798 ft.# Of Holes:60
Interval Bottom:7834 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/21/2007                Interval Top: 7156 ft.    Interval Bottom: 7834 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/5/2007
Treatment Summary:JNBCD COMMINGLE-TUBING INFORMATION
Tubing Size:2.375 in.Tubing Setting Depth:7773 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 53
BTU_GAS 1235
CALC_BBLS_H2O 21
CALC_BBLS_OIL 53
CALC_GOR 4906
CALC_MCF_GAS 260
CASING_PRESS 1209
GRAVITY_OIL 47
MCF_GAS 260
TUBING_PRESS 693
Perforation Data:
Interval Top:7156 ft.# Of Holes:172
Interval Bottom:7834 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7156 ft.    Interval Bottom: 7386 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2007
Treatment Summary:FRAC'D THE CODELL WITH 112,139 GAL FRAC FLUID AND 250,000# 30/50 SAND FRAC'D THE NBRR WITH 177,660 GAL FRAC FLUID AND 250,400# 30/50 SD 3/9/07.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 123
BBLS_OIL 102
CALC_BBLS_H2O 123
CALC_BBLS_OIL 102
CALC_GOR 7029
CALC_MCF_GAS 717
CASING_PRESS 1165
MCF_GAS 717
Perforation Data:
Interval Top:7156 ft.# Of Holes:112
Interval Bottom:7386 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)6452
GOR70130
GOR DeterminationMCFE
Average BOE per Day3.302
Average MCFE per Day19.157

 Federal Financial Assurance  i 

 Tribal Well  i No