|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 7960 ft. Vertical TD: 7911 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20070246 | Expiration Date: | 2/13/2008 | | Proposed Depth/Form: | 7954 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4979 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 4059 ft., Bottom: 4979 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/5/2007 | | Spud Date: | 2/27/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7960 ft. | Measured PB depth: | | | True Vertical TD: | 7911 ft. | True Vertical PB depth: | | | Log Types: | CBL,DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 691 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 691 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7938 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 6200 ft., Bottom: 7938 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5062 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 3690 ft., Bottom: 5080 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4240 ft. | | N | N | | SHANNON | 4708 ft. | | N | N | | NIOBRARA | 7095 ft. | | N | N | | CODELL | 7364 ft. | | N | N | | J SAND | 7796 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7798 ft. Interval Bottom: 7834 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE JSND WITH 172,158 GAL FRAC FLUID AND 238,580# 20/40 SAND. 03/09/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7798 ft. | # Of Holes: | 60 | | Interval Bottom: | 7834 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/21/2007 Interval Top: 7156 ft. Interval Bottom: 7834 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/5/2007 | | Treatment Summary: | JNBCD COMMINGLE-TUBING INFORMATION |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7773 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/21/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 53 | | BTU_GAS | 1235 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 53 | | CALC_GOR | 4906 | | CALC_MCF_GAS | 260 | | CASING_PRESS | 1209 | | GRAVITY_OIL | 47 | | MCF_GAS | 260 | | TUBING_PRESS | 693 |
| | Perforation Data: | | Interval Top: | 7156 ft. | # Of Holes: | 172 | | Interval Bottom: | 7834 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7156 ft. Interval Bottom: 7386 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2007 | | Treatment Summary: | FRAC'D THE CODELL WITH 112,139 GAL FRAC FLUID AND 250,000# 30/50 SAND FRAC'D THE NBRR WITH 177,660 GAL FRAC FLUID AND 250,400# 30/50 SD 3/9/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/4/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 123 | | BBLS_OIL | 102 | | CALC_BBLS_H2O | 123 | | CALC_BBLS_OIL | 102 | | CALC_GOR | 7029 | | CALC_MCF_GAS | 717 | | CASING_PRESS | 1165 | | MCF_GAS | 717 |
| | Perforation Data: | | Interval Top: | 7156 ft. | # Of Holes: | 112 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 92 |
| Total Gas Produced (MCF) | 6452 |
| GOR | 70130 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.302 |
| Average MCFE per Day | 19.157 |
| Federal Financial Assurance | i | |
|
|