|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/12/2018 Measured TD: 7560 ft. Vertical TD: 7470 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/12/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070005 | Expiration Date: | 2/4/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2560 FNL 1190 FEL | | Bottom Hole Location: | Sec:36 Twp: 3N 67W | Footage: 2560 FNL 1190 FEL | | Proposed Depth/Form: | 7558 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/18/2007 | | Spud Date: | 4/11/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7560 ft. | Measured PB depth: | 7519 ft. | | True Vertical TD: | 7470 ft. | True Vertical PB depth: | 7429 ft. | | Top PZ Location: | Sec:36 Twp: 3N 67W | Footage: 2481 FNL 1257 FEL | | Bottom Hole Location: | Sec:36 Twp: 3N 67W | Footage: 2481 FNL 1257 FEL | | Log Types: | CAL-ML-CDL-CNL-DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 929 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7554 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 3885 ft., Bottom: 7554 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4886 ft. | | N | N | | NIOBRARA | 7125 ft. | | N | N | | FORT HAYS | 7384 ft. | | N | N | | CODELL | 7408 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/20/2007 Interval Top: 7408 ft. Interval Bottom: 7427 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/17/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2007 | | Treatment Summary: | 130,998 GALS FLUID & 220,660 LBS 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 57 | | Interval Bottom: | 7427 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/12/2018 Interval Top: 7145 ft. Interval Bottom: 7427 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/17/2007 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/18/2007 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/20/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1232 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 4310 | | CALC_MCF_GAS | 250 | | CASING_PRESS | 600 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7145 ft. | # Of Holes: | 123 | | Interval Bottom: | 7427 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/20/2007 Interval Top: 7145 ft. Interval Bottom: 7280 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/17/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2007 | | Treatment Summary: | 169,216 GALS FLUID & 252,100 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7145 ft. | # Of Holes: | 66 | | Interval Bottom: | 7280 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/12/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|