Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24742
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:FRANCIS ARENS #6-4-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:289172LocationID:336710
County:WELD #123Location:NESE 15 4N65W 6
Field:WATTENBERG - #90750Elevation:4693 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2045FSL  668 FELLat/Long: 40.310790 / -104.642080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.310781 / -104.642067Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/2/2012
End Date: 1/2/2012
Reported: 8/6/2012
Prior to rule 205A.b.(2)(A)
Days to report: 217
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 7782 ft.    Vertical TD: 7714 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20066404 Expiration Date:1/29/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2590 FSL  1320 FEL
Bottom Hole Location:Sec:15 Twp: 4N 65W Footage: 2590 FSL  1320 FEL
Proposed Depth/Form:7752 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 318A , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 318A , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:2/4/2008
Spud Date:1/28/2008Spud Date Is:ACTUAL
Measured TD:7782 ft.Measured PB depth:7716 ft.
True Vertical TD:7714 ft.True Vertical PB depth:7648 ft.
Top PZ Location:Sec:15 Twp: 4N 65WFootage: 2570 FSL  1327 FEL
Bottom Hole Location:Sec:15 Twp: 4N 65WFootage: 2570 FSL  1327 FEL
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 558 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 558 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7738 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6430 ft., Bottom: 7738 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4769 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 4074 ft., Bottom: 4769 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4298 ft.NN
NIOBRARA6806 ft.NN
CODELL7109 ft.NN
J SAND7586 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  PR - 1/1/2026                  Interval Top: 7615 ft.    Interval Bottom: 7630 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/13/2008
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND WITH 162,876 GAL FRAC FLUID AND 251,400# SAND. 02/13/08.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7615 ft.# Of Holes:30
Interval Bottom:7630 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/19/2012                 Interval Top: 7109 ft.    Interval Bottom: 7217 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/2/2012
Treatment Summary:Frac’d 7109’ – 7217’ with 117,902 gal frac fluid and 242,663 # sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7109 ft.# Of Holes:72
Interval Bottom:7217 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 1/1/2026                  Interval Top: 6820 ft.    Interval Bottom: 7217 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/7/2012
Treatment Summary:CIBP set @ 7170’ and CFP set @ 6980’ 01-02-12. CFP drilled up on 02/01/12. CIBP still in hole. Tubing was set @ 7093 on 2/1/12 and turned to production 2/3/12.
Formation Treatment
Treatment Date:2/13/2008
Treatment Summary:NBRR-CDL RECOMPLETION. SET CFP @ 7220'. 02/13/08. FRAC'D THE CODELL WITH 114,040 GAL FRAC FLUID AND 252,060# SAND. 02/13/08. SET CFP @ 7000'. 02/13/08. FRAC'D THE NIOBRARA WITH 170,962 GAL FRAC FLUID AND 267,159# SAND. 02/13/08.
Tubing Size:2.375 in.Tubing Setting Depth:7093 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2012Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 38
BTU_GAS 1
CALC_BBLS_H2O 23
CALC_BBLS_OIL 38
CALC_GOR 14631
CALC_MCF_GAS 556
CASING_PRESS 685
GRAVITY_OIL 62
MCF_GAS 556
TUBING_PRESS 449
Perforation Data:
Interval Top:6820 ft.# Of Holes:140
Interval Bottom:7217 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/8/2008                  Interval Top: 6806 ft.    Interval Bottom: 7630 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/4/2008
Treatment Summary:JSND-NBRR-CDL COMINGLE; SET CBP @ 6700 03-03-08. DRILLED UP CBP @ 6700. 03-04-08. DRILLED UP CFP @ 7000 AND 7220 TO COMMINGLE JSND-NBBR-CODL 03-04-08
Tubing Size:2.375 in.Tubing Setting Depth:7600 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/8/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 112
BBLS_OIL 43
BTU_GAS 1212
CALC_BBLS_H2O 112
CALC_BBLS_OIL 43
CALC_GOR 16605
CALC_MCF_GAS 714
CASING_PRESS 1450
GRAVITY_OIL 57
MCF_GAS 714
TUBING_PRESS 1040
Perforation Data:
Interval Top:6806 ft.# Of Holes:710
Interval Bottom:7630 ft.Hole Size:0.421875 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/19/2012                 Interval Top: 6806 ft.    Interval Bottom: 6922 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/2/2012
Treatment Summary:Frac’d 6806’ – 6820’, 6902’ – 6922’ with 175,405 gal frac fluid and 239,638 # sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6806 ft.# Of Holes:68
Interval Bottom:6922 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)220
Total Gas Produced (MCF)3580
GOR16272
GOR DeterminationMCFE
Average BOE per Day2.317
Average MCFE per Day13.412

 Federal Financial Assurance  i 

 Tribal Well  i No