|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/19/2025 Measured TD: 7540 ft. Vertical TD: 7453 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/19/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20080315 | Expiration Date: | 3/17/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2600 FSL 1320 FWL | | Bottom Hole Location: | Sec:31 Twp: 4N 67W | Footage: 2600 FSL 1320 FWL | | Proposed Depth/Form: | 7618 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 11/13/2008 | | Spud Date: | 11/9/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7540 ft. | Measured PB depth: | 7497 ft. | | True Vertical TD: | 7453 ft. | True Vertical PB depth: | 7410 ft. | | Top PZ Location: | Sec:31 Twp: 4N 67W | Footage: 2560 FSL 1330 FWL | | Bottom Hole Location: | Sec:31 Twp: 4N 67W | Footage: 2560 FSL 1330 FWL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 771 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 771 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7527 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 2700 ft., Bottom: 7527 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3694 ft. | 3926 ft. | N | N | | SUSSEX | 4178 ft. | 4454 ft. | N | N | | SHANNON | 4703 ft. | 4838 ft. | N | N | | NIOBRARA | 7100 ft. | | N | N | | FORT HAYS | 7374 ft. | | N | N | | CODELL | 7394 ft. | | N | N |
Formation CODL Formation Classification: GW Status: AB - 3/19/2025 Interval Top: 7396 ft. Interval Bottom: 7416 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/12/2008 | Choke Size: | 1.000 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2008 | | Treatment Summary: | 188,191 GALS FLUID & 151,120# 40/70 SAND & 6000# 20/40 SB EXCEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7355 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1321 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 4536 | | CALC_MCF_GAS | 127 | | CASING_PRESS | 962 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 824 |
| | Perforation Data: | | Interval Top: | 7396 ft. | # Of Holes: | 60 | | Interval Bottom: | 7416 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/19/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.032 |
| Federal Financial Assurance | i | |
|
|