Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24623
Well Classification: OW Status: PA - 3/17/2023
Well Name/No:KING #31-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/17/2023
FacilityID:288603LocationID:306421
County:WELD #123Location:NWNE 29 7N65W 6
Field:EATON - #19350Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:476FNL  2164 FELLat/Long: 40.551690 / -104.685360Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.551670 / -104.685310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/17/2023             Measured TD: 7474 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/17/2023
Wellbore Permit
Permit #:20065797 Expiration Date:12/26/2007
Proposed Depth/Form:7545 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/26/2007
Spud Date:1/20/2007Spud Date Is:ACTUAL
Measured TD:7474 ft.Measured PB depth:7423 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL/DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7466 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 6406 ft., Bottom: 7466 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7466 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 6406 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7010 ft.NN
FORT HAYS7237 ft.NN
CODELL7273 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/1/2007                  Interval Top: 7274 ft.    Interval Bottom: 7284 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/13/2007
Treatment Summary:FRAC'D CODELL W/2580 BBLS OF VISTAR 20# FLUID SYSTEM,220760 LBS OF 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7274 ft.# Of Holes:30
Interval Bottom:7284 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/17/2023                 Interval Top: 7114 ft.    Interval Bottom: 7284 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/26/2007
Treatment Summary:DRILLED OUT PLUG TO COMMINGLE CODELL WITH THE NIOBRARA.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 49
BTU_GAS 1000
CALC_BBLS_H2O 6
CALC_BBLS_OIL 49
CALC_GOR 2184
CALC_MCF_GAS 107
CASING_PRESS 1800
GRAVITY_OIL 35
MCF_GAS 107
TUBING_PRESS 1690
Perforation Data:
Interval Top:7114 ft.# Of Holes:78
Interval Bottom:7284 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/1/2007                  Interval Top: 7114 ft.    Interval Bottom: 7130 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/20/2007
Treatment Summary:FRAC THROUGH PLUG@7180' FRAC'D NBRR W/500 GAL 15% HCL,1588 BBLS SLICKWATER PAD, 164 BBLS OF VISTAR 18# PAD,2609 BBLS OF VISTAR 18# FLUID SYSTEM,245660 LBS OF 30/50 WHITE SAND AND 8000 LBS OF SUPER LC 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7114 ft.# Of Holes:48
Interval Bottom:7130 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/17/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No