|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2025 Measured TD: 8050 ft. Vertical TD: 7957 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/24/2011 | Proposed Top PZ Location: | Sec:10 Twp: 3N 66W | Footage: 1250 FNL 2610 FEL | Bottom Hole Location: | Sec:10 Twp: 3N 66W | Footage: 1261 FNL 2624 FEL | Proposed Depth/Form: | 8050 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-37 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 583 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 583 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8051 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 3760 ft., Bottom: 8051 ft. |
| | |
Wellbore Completed | Completion Date: | 3/24/2007 | Spud Date: | 3/17/2007 | Spud Date Is: | ACTUAL | Measured TD: | 8050 ft. | Measured PB depth: | 7982 ft. | True Vertical TD: | 7957 ft. | True Vertical PB depth: | 7889 ft. | Top PZ Location: | Sec:10 Twp: 3N 66W | Footage: 1250 FNL 2610 FEL | Bottom Hole Location: | Sec:10 Twp: 3N 66W | Footage: 1261 FNL 2624 FEL | Log Types: | CDL-CNL-DIL-CBL-ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 584 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 0 ft., Bottom: 584 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8011 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 3750 ft., Bottom: 8011 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1494 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 420 ft., Bottom: 1493 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3946 ft. | | N | N | SUSSEX | 4398 ft. | | N | N | NIOBRARA | 7118 ft. | | N | N | FORT HAYS | 7393 ft. | | N | N | CODELL | 7416 ft. | | N | N | J SAND | 7881 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/8/2025 Interval Top: 7898 ft. Interval Bottom: 7928 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/15/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/8/2010 | Treatment Summary: | FRAC JSND W/ 163,024 GAL SW & 115,280# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1200 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 2 | CALC_GOR | 78000 | CALC_MCF_GAS | 156 | CASING_PRESS | 300 | GRAVITY_OIL | 62 |
| Perforation Data: | Interval Top: | 7898 ft. | # Of Holes: | 60 | Interval Bottom: | 7928 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 7/8/2025 Interval Top: 7416 ft. Interval Bottom: 7430 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/2/2007 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/24/2007 | Treatment Summary: | 166,068 GALS FLUID & 115,760 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7416 ft. | # Of Holes: | 56 | Interval Bottom: | 7430 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/8/2025 Interval Top: 7122 ft. Interval Bottom: 7430 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/15/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/26/2007 | Treatment Summary: | NBRR - PERF 7122-7290 HOLES 113 SIZE 0.42. CODL - PERF 7416-7430 HOLES 56 SIZE 0.38. NO ADDITIONAL TREATMENT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 22 | BTU_GAS | 1200 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 2 | CALC_GOR | 78000 | CALC_MCF_GAS | 156 | CASING_PRESS | 300 | GRAVITY_OIL | 62 | MCF_GAS | 591 |
| Perforation Data: | Interval Top: | 7122 ft. | # Of Holes: | 169 | Interval Bottom: | 7430 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/8/2025 Interval Top: 7122 ft. Interval Bottom: 7290 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/2/2007 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/26/2007 | Treatment Summary: | 176,818 GALS FLUID & 250,320 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7122 ft. | # Of Holes: | 113 | Interval Bottom: | 7290 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 990 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.468 |
Average MCFE per Day | 2.694 |
Federal Financial Assurance | i | |
|
|