|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2022 Measured TD: 8115 ft. Vertical TD: 7994 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/18/2011 | | Proposed Top PZ Location: | Sec:27 Twp: 3N 66W | Footage: 93 FSL 1242 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 93 FSL 1242 FWL | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S27:S/2SW/4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 713 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 713 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8104 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 565, Top: 3650 ft., Bottom: 8104 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/19/2007 | | Spud Date: | 6/12/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8115 ft. | Measured PB depth: | 8089 ft. | | True Vertical TD: | 7994 ft. | True Vertical PB depth: | 7968 ft. | | Top PZ Location: | Sec:27 Twp: 3N 66W | Footage: 93 FSL 1242 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 93 FSL 1242 FWL | | Log Types: | CBL, P/E CNLD -AILC - CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 726 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 726 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8105 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 565, Top: 3378 ft., Bottom: 8105 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4096 ft. | | N | N | | SUSSEX | 4598 ft. | | N | N | | NIOBRARA | 7242 ft. | | N | N | | FORT HAYS | 7510 ft. | | N | N | | CODELL | 7533 ft. | | N | N | | J SAND | 7960 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 7/1/2020 Interval Top: 7948 ft. Interval Bottom: 8006 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/27/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2010 | | Treatment Summary: | FRAC JSND W/152,376 GAL SW & 95,500# 40/70 SAND & 4,000# SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7932 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/10/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1237 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 54500 | | CALC_MCF_GAS | 109 | | CASING_PRESS | 1018 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 952 |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | 84 | | Interval Bottom: | 8006 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/12/2012 Interval Top: 7534 ft. Interval Bottom: 7550 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/12/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/25/2007 | | Treatment Summary: | 170,000 GALS FLUID & 115,000# OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7534 ft. | # Of Holes: | 64 | | Interval Bottom: | 7550 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7260 ft. Interval Bottom: 7550 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/12/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2010 | | Treatment Summary: | NBRR PERF 7260-7400 HOLES 82 SIZE 0.42 CODL PERF 7534-7550 HOLES 64 SIZE 0.38 NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 6/19/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7932 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/10/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1237 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 54400 | | CALC_MCF_GAS | 109 | | CASING_PRESS | 1018 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 952 |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 146 | | Interval Bottom: | 7550 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/12/2012 Interval Top: 7260 ft. Interval Bottom: 7400 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/12/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/25/2007 | | Treatment Summary: | 256,500 GALS FLUID & 200,000# 30/50 OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 82 | | Interval Bottom: | 7400 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|